<strong>Corporate</strong> <strong>responsibility</strong> <strong>report</strong><br />

Arkadiusz Kamiński<br />

Environmental Protection Office Director<br />

in <strong>PKN</strong> ORLEN<br />

of strenuous and difficult work was crowned with<br />

success. The team of beaver catchers left Płock convinced<br />

that at least one beaver was left on the area<br />

of the „Moczary” reservoir. Therefore, the operation<br />

was repeated in Decem ber. The hunters found one<br />

adult beaver – a female, which joined the beavers that<br />

had been caught earlier.<br />

/ <strong>Responsible</strong> Care<br />

Since 1997 <strong>PKN</strong> ORLEN has participated in the <strong>Responsible</strong><br />

Care Programme (RC). The Programme is the chemical<br />

industry’s global initiative under which chemical<br />

companies work together to continuously improve their<br />

safety, health and environmental performance and openly<br />

communicate their activities.<br />

In 2009 the Environmental Protection Department,<br />

apart from performing its ordinary duties, had to deal<br />

with a very unusual task, whose aim was to catch and<br />

resettle the family of beavers which inhabited the Plant<br />

premises. How was this task performed?<br />

<strong>PKN</strong> ORLEN contracted a group of specialists from<br />

the Polish Hunting Association to catch and resettle<br />

the beavers. The action was initiated on 20 October<br />

2009. To perform this task, <strong>PKN</strong> ORLEN engaged<br />

the only such team of specialists in Poland. The most<br />

difficult part of the task was to locate the positions where<br />

the beavers could be found, i.e. all lodges, holes, corridors<br />

through which beavers may escape to the darkest<br />

corners. The entire action was supported by trained<br />

dogs of Jagdterrier breed which can drive beavers out<br />

of their holes and lodges. All such places were guarded.<br />

A net was spread across the reservoir to the depth<br />

of at least 4 m.<br />

The entities implementing the RC Programme each year<br />

announce the execution of certain tasks aimed at improving<br />

their activity in the field of the so-called HSE triad<br />

(Health, Safety and Environment). They develop required<br />

<strong>report</strong>s and submit them to the Programme Secretariat.<br />

Based on such information, the Polish Chamber of Chemical<br />

Industry – an employers’ organization, publishes<br />

annually an Environmental Report presenting the achievements<br />

of companies in the scope of reduction of their<br />

negative impact, as well as results of the Programme<br />

implementation. This synthetic form constitutes a significant<br />

element of the Programme and made the chemical industry<br />

one of the Polish precursors of open information policy<br />

in the field of environmental protection.<br />

In 2009 the Company completed and submitted to the Programme<br />

Secretariat the following questionnaires:<br />

• “Indicators – <strong>report</strong>ing for 2008,”<br />

• “Environmental database for 2008,”<br />

• “Report on execution of tasks in 2008.”<br />

The first beaver – an adult female weighing 18.5 kg was<br />

caught already on the first day. Then – a male weighing<br />

19 kg and two young female and male beavers of two<br />

years of age and weighing 15.5 kg and 14 kg, respectively,<br />

were caught on 21 October 2009. The beavers<br />

were put into cages.<br />

The entire family was successfully transported on 22<br />

October to the area of the Osetnica River. Two days<br />

Of 32 tasks <strong>report</strong>ed for implementation in 2009 (including<br />

8 continuous, 12 continuations of tasks implemented<br />

in 2008 and 12 new), the 16 tasks in total were implemented<br />

in individual areas:<br />

• environmental protection – 6 out of 12 tasks, 4 tasks<br />

will be continued in 2010, while 2 tasks were given<br />

the „uncompleted” status as a result of difficult macroeconomic<br />

situation and their implementation was rescheduled<br />

for later,<br />