026<br />
Orange Ball, <strong>Port</strong> <strong>Hedland</strong> Speedway, Variety WA, C3<br />
Church MYGEN Conference, Yo Gabba Gabba Event, <strong>Port</strong><br />
<strong>Hedland</strong> S<strong>of</strong>tball Association, Pink Ribbon Breakfast,<br />
Seafarers Shoe Box Appeal, Town <strong>of</strong> <strong>Port</strong> <strong>Hedland</strong><br />
Christmas Lights Competition, Sports wheel chair and<br />
wheel chair for basketball, Constable Care Child Safety<br />
<strong>Hedland</strong> School Visit 31 Footballs, and Cancer Council’s<br />
Greatest Morning Tea event.<br />
Environment, Community Safety and Health: To protect<br />
the environment <strong>of</strong> the <strong>Port</strong> area and minimise the<br />
impacts <strong>of</strong> <strong>Port</strong> activities on the environment and the<br />
community by ensuring that environmental management<br />
is incorporated in our operations and <strong>Port</strong> development.<br />
Marine pollution response capability<br />
A number <strong>of</strong> staff were trained in oil spill response and oil<br />
spill management. The PHPA installed world class, first<br />
strike oil response equipment in the inner harbour. This<br />
equipment augments state and federal emergency spill<br />
response capability in <strong>Port</strong> <strong>Hedland</strong> and reflects the Board’s<br />
commitment to the protection <strong>of</strong> the natural environment.<br />
Ensure dust and noise <strong>of</strong> future developments are<br />
sufficiently minimised and mitigated<br />
The PHPA has developed a set <strong>of</strong> dust management<br />
guidelines which have been endorsed by the Board <strong>of</strong><br />
Directors. These guidelines will be applied to all future<br />
developments at the <strong>Port</strong> and existing operations will<br />
be encouraged to comply. The PHPA has developed<br />
and implemented a Noise Monitoring Program and<br />
undertaken an Occupational Noise Exposure Program<br />
at Utah.<br />
Manage mangrove habitats<br />
Significant scientific research, including a number <strong>of</strong><br />
trials, were undertaken to determine the feasibility <strong>of</strong> a<br />
mangrove <strong>of</strong>fset program.<br />
2010/11 PHPA Environmental Management Plan (EMP)<br />
The PHPA EMP was implemented with the majority <strong>of</strong><br />
targets met. A copy <strong>of</strong> the EMP can be found on the<br />
PHPA’s website at www.phpa.com.au.<br />
Minimise contamination <strong>of</strong> the harbour sediments from<br />
product spillage<br />
A number <strong>of</strong> upgrades were undertaken on the No.1<br />
Wharf shiploading system including the installation <strong>of</strong><br />
concrete bunding to the wharf and the installation <strong>of</strong> a<br />
spill plate to the ship-loader.<br />
The Utah Point Berth Facility has been designed to<br />
capture all run-<strong>of</strong>f water and rainfall up to a one-in-ten<br />
year event. All water will be recycled through the facility.<br />
Minimise dust from the PHPA area<br />
The PHPA has installed five E-Samplers as part <strong>of</strong> the<br />
operational dust management program. Dust monitoring<br />
data has been analysed and dust exceedance alarms<br />
were developed. The program will be expanded further to<br />
include an interactive dust management system to assist<br />
operators in dealing with dust events.<br />
The PHPA has been a key participant in both the <strong>Port</strong><br />
<strong>Hedland</strong> Industries Council and the State Government<br />
Dust Taskforce.