028<br />
berths at BHP’s Harriet Point Finucane Island facility<br />
coming on line in November and December respectively.<br />
This increased <strong>Port</strong> operational environment, along<br />
with operational upgrades at some existing facilities,<br />
has seen an increase in <strong>Port</strong> throughput by more than<br />
21 million tonnes for the year to reach an annual total <strong>of</strong><br />
more than 199 million tonnes.<br />
Staffing levels continue to increase within all Marine,<br />
Landside and Maintenance Operations sections, with<br />
a newly created position <strong>of</strong> Maintenance Manager<br />
appointed. Demand on all <strong>Port</strong> services continues<br />
to grow with large scale construction and dredging<br />
programs continuing throughout the year.<br />
The transition to new technologies is well advanced<br />
with a new web based on-line Klein booking system<br />
expected to be rolled out later in <strong>2011</strong> and further<br />
advancement in Klein / DUKC optimisation s<strong>of</strong>tware also<br />
on the horizon.<br />
Pilotage<br />
“At year end the UTAH FACILITY<br />
was performing beyond<br />
EXPECTATION in shipping 951,000<br />
tonnes in the month <strong>of</strong> June.”<br />
A number <strong>of</strong> sustainable technology initiatives were<br />
adopted to address the complexities <strong>of</strong> constructing a<br />
<strong>Port</strong> facility to transport, store and export a multitude<br />
<strong>of</strong> minerals with potentially adverse environmental and<br />
community impacts. Innovations include a 45,000m 3 water<br />
recirculation and stormwater harvesting system, bentonite<br />
geosynthetic lined stockyard floor with plastic reinforced<br />
seawall embankments, quad road-train wash facilities and<br />
a commitment to a mangrove propagation farm.<br />
<strong>Port</strong> <strong>Hedland</strong> Pilots continued to provide pilotage<br />
services within the <strong>Port</strong> <strong>Hedland</strong> harbour having<br />
completed the first year <strong>of</strong> a five year service contract.<br />
Continued growth in shipping movements has required<br />
an increase from 12 to 16 permanent marine pilots, with<br />
significant resources being invested in best practice pilot<br />
training.<br />
During 2010/11 a total <strong>of</strong> 3,027 piloted shipping<br />
movements were undertaken, representing a 15%<br />
increase on shipping movements in comparison to the<br />
2009/10 financial year.<br />
Number <strong>of</strong> Piloted Movements<br />
At year end the facility was performing beyond<br />
expectation in shipping 951,000 tonnes in the month <strong>of</strong><br />
June equating to an annualised export rate <strong>of</strong> 11.6Mtpa.<br />
OUR PERFORMANCE<br />
<strong>Port</strong> Operations<br />
<strong>Port</strong> Operations has experienced significant growth<br />
in all areas during the year, which included operating<br />
berths, <strong>Port</strong> throughput, construction activity, vessel<br />
management and staffing levels.<br />
The new multi-user facility at Utah Point was<br />
commissioned in September 2010 with further new