20.05.2014 Views

BG Fernandes Department of Electrical Engineering II T - Power ...

BG Fernandes Department of Electrical Engineering II T - Power ...

BG Fernandes Department of Electrical Engineering II T - Power ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TCR<br />

Contd..<br />

GCSC<br />

• Switch is series with ‘L’<br />

• Supplied from a ‘V’<br />

source<br />

• ‘α’ (turn-ON delay) is<br />

measured w.r.t peak <strong>of</strong> ‘v’<br />

• Switch is parallel with ‘C’<br />

• Supplied from a ‘i’<br />

source<br />

• ‘α’ (turn-OFF delay) is<br />

measured w.r.t peak <strong>of</strong> ‘i’<br />

Application <strong>of</strong> <strong>Power</strong> Electronics in <strong>Power</strong> Systems<br />

B. G. <strong>Fernandes</strong><br />

254/454

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!