21.05.2014 Views

2010 FERC Form 1 - Pacific Gas and Electric Company

2010 FERC Form 1 - Pacific Gas and Electric Company

2010 FERC Form 1 - Pacific Gas and Electric Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Name of Respondent<br />

PACIFIC GAS AND ELECTRIC COMPANY<br />

This Report is:<br />

(1) X An Original<br />

(2) A Resubmission<br />

Date of Report<br />

(Mo, Da, Yr)<br />

04/08/2011<br />

Year/Period of Report<br />

<strong>2010</strong>/Q4<br />

FOOTNOTE DATA<br />

IFS<br />

IFAS<br />

ISIS<br />

OIS<br />

SAIS<br />

SIS<br />

FSS<br />

Interconnection Feasibility Study<br />

Interconnection Facility Study<br />

Interconnection System Impact Re-Study<br />

Optional Interconnection Study<br />

Second Amended Interconnection Study<br />

System Impact Study<br />

Feasibility Study Scoping<br />

<strong>FERC</strong> FORM NO. 1 (ED. 12-87) Page 450.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!