21.05.2014 Views

2010 FERC Form 1 - Pacific Gas and Electric Company

2010 FERC Form 1 - Pacific Gas and Electric Company

2010 FERC Form 1 - Pacific Gas and Electric Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Name of Respondent<br />

PACIFIC GAS AND ELECTRIC COMPANY<br />

This Report is:<br />

(1) X An Original<br />

(2) A Resubmission<br />

Date of Report<br />

(Mo, Da, Yr)<br />

04/08/2011<br />

Year/Period of Report<br />

<strong>2010</strong>/Q4<br />

FOOTNOTE DATA<br />

Schedule Page: 422 Line No.: 1 Column: e<br />

The designations for the type of supporting structure in this column are defined as<br />

follows:<br />

SSP - Single Steel Poles<br />

SWP - Single Wood Poles<br />

WH - Wood "H" Structures<br />

T - Steel Towers<br />

UG - Underground<br />

Schedule Page: 422 Line No.: 1 Column: f<br />

The data for this column is not available on a circuit-by-circuit basis as the Utility's<br />

Geographic Information System is in the process of compiling the necessary data at this<br />

time.<br />

Schedule Page: 422 Line No.: 1 Column: g<br />

The data for this column is not available on a circuit-by-circuit basis as the Utility's<br />

Geographic Information System is in the process of compiling the necessary data at this<br />

time.<br />

Schedule Page: 422 Line No.: 5 Column: i<br />

Bundled.<br />

Schedule Page: 422 Line No.: 9 Column: i<br />

Bundled.<br />

Schedule Page: 422 Line No.: 22 Column: i<br />

Bundled.<br />

Schedule Page: 422.1 Line No.: 5 Column: i<br />

Bundled.<br />

Schedule Page: 422.1 Line No.: 6 Column: i<br />

Bundled.<br />

Schedule Page: 422.1 Line No.: 7 Column: i<br />

Bundled.<br />

Schedule Page: 422.1 Line No.: 8 Column: i<br />

Bundled.<br />

Schedule Page: 422.1 Line No.: 9 Column: i<br />

Bundled.<br />

Schedule Page: 422.3 Line No.: 29 Column: i<br />

Bundled.<br />

Schedule Page: 422.3 Line No.: 30 Column: i<br />

Bundled.<br />

Schedule Page: 422.3 Line No.: 31 Column: i<br />

Bundled.<br />

Schedule Page: 422.3 Line No.: 34 Column: i<br />

Oil Filled.<br />

Schedule Page: 422.3 Line No.: 35 Column: i<br />

AL cable.<br />

Schedule Page: 422.4 Line No.: 6 Column: f<br />

Idle.<br />

Schedule Page: 422.4 Line No.: 20 Column: i<br />

Bundled.<br />

Schedule Page: 422.5 Line No.: 2 Column: f<br />

For 6.53 miles, the #2 position on these towers is occupied by the Sacramento Municipal<br />

Utilities District's ("SMUD") White Rock-Elverta 230 kV line. SMUD purchased a half<br />

interest in these towers.<br />

Schedule Page: 422.5 Line No.: 4 Column: g<br />

Property of SMUD (excluded from total length on last page of 422).<br />

Schedule Page: 422.6 Line No.: 1 Column: i<br />

<strong>FERC</strong> FORM NO. 1 (ED. 12-87) Page 450.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!