Name of Respondent<br />

PACIFIC GAS AND ELECTRIC COMPANY<br />

This Report Is:<br />

Date of Report<br />

(1) X An Original<br />

(Mo, Da, Yr)<br />

(2) A Resubmission<br />

04/08/2011<br />

PURCHASED POWER(Account 555) (Continued)<br />

(Including power exchanges)<br />

Year/Period of Report<br />

End of <strong>2010</strong>/Q4<br />

AD - for out-of-period adjustment. Use this code for any accounting adjustments or "true-ups" for service provided in prior reporting<br />

years. Provide an explanation in a footnote for each adjustment.<br />

4. In column (c), identify the <strong>FERC</strong> Rate Schedule Number or Tariff, or, for non-<strong>FERC</strong> jurisdictional sellers, include an appropriate<br />

designation for the contract. On separate lines, list all <strong>FERC</strong> rate schedules, tariffs or contract designations under which service, as<br />

identified in column (b), is provided.<br />

5. For requirements RQ purchases <strong>and</strong> any type of service involving dem<strong>and</strong> charges imposed on a monnthly (or longer) basis, enter<br />

the monthly average billing dem<strong>and</strong> in column (d), the average monthly non-coincident peak (NCP) dem<strong>and</strong> in column (e), <strong>and</strong> the<br />

average monthly coincident peak (CP) dem<strong>and</strong> in column (f). For all other types of service, enter NA in columns (d), (e) <strong>and</strong> (f). Monthly<br />

NCP dem<strong>and</strong> is the maximum metered hourly (60-minute integration) dem<strong>and</strong> in a month. Monthly CP dem<strong>and</strong> is the metered dem<strong>and</strong><br />

during the hour (60-minute integration) in which the supplier's system reaches its monthly peak. Dem<strong>and</strong> reported in columns (e) <strong>and</strong> (f)<br />

must be in megawatts. Footnote any dem<strong>and</strong> not stated on a megawatt basis <strong>and</strong> explain.<br />

6. Report in column (g) the megawatthours shown on bills rendered to the respondent. Report in columns (h) <strong>and</strong> (i) the megawatthours<br />

of power exchanges received <strong>and</strong> delivered, used as the basis for settlement. Do not report net exchange.<br />

7. Report dem<strong>and</strong> charges in column (j), energy charges in column (k), <strong>and</strong> the total of any other types of charges, including<br />

out-of-period adjustments, in column (l). Explain in a footnote all components of the amount shown in column (l). Report in column (m)<br />

the total charge shown on bills received as settlement by the respondent. For power exchanges, report in column (m) the settlement<br />

amount for the net receipt of energy. If more energy was delivered than received, enter a negative amount. If the settlement amount (l)<br />

include credits or charges other than incremental generation expenses, or (2) excludes certain credits or charges covered by the<br />

agreement, provide an explanatory footnote.<br />

8. The data in column (g) through (m) must be totalled on the last line of the schedule. The total amount in column (g) must be<br />

reported as Purchases on Page 401, line 10. The total amount in column (h) must be reported as Exchange Received on Page 401,<br />

line 12. The total amount in column (i) must be reported as Exchange Delivered on Page 401, line 13.<br />

9. Footnote entries as required <strong>and</strong> provide explanations following all required data.<br />

POWER EXCHANGES<br />

MegaWatt Hours<br />

MegaWatt Hours MegaWatt Hours<br />

Purchased<br />

Received<br />

Delivered<br />

(g)<br />

(h)<br />

(i)<br />

3,009<br />

584<br />

1,848<br />

2,849<br />

895<br />

4,404<br />

328<br />

2,010<br />

2,805<br />

1,911<br />

COST/SETTLEMENT OF POWER<br />

Line<br />

Dem<strong>and</strong> Charges Energy Charges Other Charges Total (j+k+l) No.<br />

($) ($) ($)<br />

of Settlement ($)<br />

(j)<br />

(k)<br />

(l)<br />

(m)<br />

58,695 139,844 198,539 1<br />

2,308 25,176 27,484 2<br />

49,160 112,900 162,060 3<br />

78,406 172,915 251,321 4<br />

27,164 53,118 80,282 5<br />

72,144 207,905 280,049 6<br />

2,001 14,602 16,603 7<br />

43,245 91,320 134,565 8<br />

9<br />

33,752 137,931 171,683 10<br />

11<br />

12<br />

13<br />

6,728 90,820 97,548 14<br />

44,837,023 754,305,279 2,879,319,814 -87,416 3,633,537,677<br />