Carmichael's Main Street - sacog
Carmichael's Main Street - sacog
Carmichael's Main Street - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
view<br />
Alternative 4: 124’ ROW<br />
• Six lanes with 12-foot wide median and 6-foot wide landscape strips<br />
• Landscaped median and sidewalks<br />
• Bus turn-outs and shelters at Stanley/Angeline, Landis and Grant, and the southwest<br />
corner of Marconi/Palm/Fair Oaks Boulevard<br />
• Additional 10-12’ of ROW would be required at major intersections to accommodate<br />
left turn lanes or discontinuation of landscape strips and trees<br />
Removed<br />
Buildings<br />
Above:<br />
This 3-D model view of Fair Oaks Boulevard is between Marconi and Robertson.<br />
It illustrates a sidewalk environment with mid-day shade in August.<br />
Left:<br />
This oblique plan view of a 3-D model is of the section between Marconi and<br />
Robertson. It assumes two older building are removed that are within the new<br />
expanded ROW and there is some consolidation of curb cuts.<br />
page 2-13