3.1.3 Revise Section 3.1.3 by deleting the word “either” and adding the following language before “or<br />
by tests”.<br />
“, activities of Owner (or Construction Manager, if applicable) conducted in accordance with the<br />
Contract Documents,”<br />
3.2.2 Delete last sentence of Section 3.2.2 in its entirety and replace with following:<br />
Any errors, omissions, or inconsistencies discovered by the Contractor shall be reported<br />
promptly to the Architect as a request for information in such form as the Architect may require.<br />
Add the following Clauses to Section 3.2.2:<br />
.1 The exactness of grades, elevations, dimensions, or locations given on any Drawings<br />
issued by the Architect, or the work installed by other contractors, is not guaranteed by the<br />
Architect or the Owner.<br />
.2 The Contractor shall, therefore, satisfy itself as to the accuracy of all grades, elevations,<br />
dimensions, and locations. In all cases of interconnection of its Work with existing or other<br />
work, it shall verify at the site all dimensions relating to such existing or other work. Any errors<br />
due to the Contractor=s failure to so verify all such grades, elevations, dimensions, or locations<br />
shall be promptly rectified by the Contractor without any additional cost to the Owner.<br />
3.2.4 Add new Section 3.2.4 as follows:<br />
Notwithstanding the delivery of a survey or other documents by the Owner, Contractor shall use<br />
reasonable efforts to perform all work in such a manner so as to avoid damaging any utility<br />
lines, cables, pipes, or pipelines on the property. Contractor shall be responsible for, and shall<br />
repair at Contractor=s own expense, any damage done to lines, cables, pipes, and pipelines<br />
identified to Contractor.<br />
3.2.5 Add new Section 3.2.5 as follows:<br />
The Owner and Contractor agree that the Contract Documents may not be free from errors,<br />
inconsistencies, or omissions, and further agree that the Owner makes no warranty as to the<br />
completeness or accuracy of the Contract documents, either express or implied. Execution of<br />
the Contract by the Contractor is a representation that the Contractor has thoroughly reviewed<br />
and become familiar with the Contract Documents and that the Contractor is not aware of any<br />
errors, inconsistencies or omissions in the Contract Documents which would delay the<br />
Contractor in the performance of the Contract Work. The Contractor shall not be entitled to any<br />
damages or increase in the Contract Amount due to delays or disruptions to the Work. This<br />
limitation on damages is further subject to the limitations set forth in Section 4.3.10.<br />
3.2.6 Add new Section 3.2.6 as follows:<br />
The Owner shall be entitled to deduct from the Contract Sum amounts paid to the Architect for<br />
the Architect to evaluate and respond to the Contractor’s request for information, where such<br />
information was available to the Contractor from a careful study and comparison of the Contract<br />
Documents, field conditions, other Owner provided information, Contractor prepared<br />
coordination drawings, or prior Project correspondence or documentation.<br />
3.2.7 Add new Section 3.2.7 as follows:<br />
The Contractor shall use the “REQUEST FOR INFORMATION” (RFI) form provided in the<br />
Contract Documents. The Contractor shall keep a log of all RFI’s submitted and number the<br />
RFI’s consecutively beginning with the number 1.<br />
3.3.1.1 Add new Clause 3.3.1.1 to Section 3.3.1 as follows:<br />
.1 The Contractor shall assign a superintendent who shall make decisions in behalf of the<br />
Contractor and its contractors. He shall be on the Project, in this capacity, at all times while<br />
work on the Project is in progress.<br />