21.06.2014 Views

RFP: 270-06-0149 2 SECTION B- SUPPLIES OR SERVICES AND ...

RFP: 270-06-0149 2 SECTION B- SUPPLIES OR SERVICES AND ...

RFP: 270-06-0149 2 SECTION B- SUPPLIES OR SERVICES AND ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>RFP</strong>: <strong>270</strong>-<strong>06</strong>-<strong>0149</strong><br />

Special reports and<br />

products<br />

Proposed methodology<br />

report<br />

Preparation of<br />

estimates/technical<br />

findings report<br />

Preparation of draft<br />

general report and draft<br />

journal article<br />

Preparation of final<br />

general report and draft<br />

journal article<br />

Preparation of supporting<br />

materials for briefings,<br />

press conferences, and<br />

presentation of project<br />

results<br />

Final contract report<br />

Turnover and transition<br />

work<br />

Contract management<br />

Total Award Fee<br />

Available<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

Each Pool gets 1/15 of the available award fee for the current year.<br />

The evaluation rating will be that % of the 1/15 of the available<br />

award fee.<br />

See Chart in Section B.2.5 for Total Award Fee Available<br />

* Percentage of Award Fee that can be actually awarded at this score.<br />

The Contracting Officer and the GPO shall together determine whether a product/service<br />

is delivered on time and within budget. If it is deemed to be on time and within budget, it<br />

will be evaluated for quality by an Award Fee Evaluation Group (Group). Each Group<br />

will consist of the GPO, the Contracting Officer or his/her designee, and approximately<br />

one other government officials or non-government personnel (depending on specific<br />

expertise) specified by the GPO and approved by the Contracting Officer. The<br />

composition of the Group may change from task to task.<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!