<strong>Sustainability</strong> <strong>is</strong> <strong>the</strong> <strong>capacity</strong> <strong>to</strong> <strong>endure</strong>. Th<strong>is</strong> <strong>involves</strong> <strong>both</strong> environmental, social and economical<br />

<strong>is</strong>sues. Therefore, aiming for a sustainable refurb<strong>is</strong>hment of buildings <strong>is</strong> <strong>both</strong> complex and<br />

challenging. First you need <strong>to</strong> define your strategy on sustainability. What <strong>is</strong> sustainable for you<br />

and your environment? Thereafter you need <strong>to</strong> create a performance profile of your building.<br />

Based on <strong>the</strong> building performance, your ambitions and available resources you are able <strong>to</strong><br />

point out <strong>the</strong> way for a sustainable refurb<strong>is</strong>hment. Th<strong>is</strong> guideline will guide you through 10 steps<br />

<strong>to</strong>wards a sustainable refurb<strong>is</strong>hment. The first 3 steps can be used for a building portfolio or a<br />

single building, while step 4-10 <strong>is</strong> only for a single building.<br />

Please click “Start guideline” in <strong>the</strong> bot<strong>to</strong>m right corner <strong>to</strong> start <strong>the</strong> journey.<br />

©


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

You are here<br />

Let an expert explain<br />

(click here)<br />

Step 10<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Sustainable indica<strong>to</strong>rs<br />

Strategy methodology<br />

Step 4<br />

Environmental<br />

Technical standard<br />

Social<br />

Economic<br />

Let an expert explain<br />

(click here)<br />

Step 5<br />

Energy<br />

Indoor climate<br />

Life cycle costs<br />

Material<br />

Adaptability<br />

Value<br />

Step 6<br />

Safety and<br />

accessability<br />

Step 7<br />

Comfort<br />

Usability<br />

Step 8<br />

Cultural values<br />

Step 9<br />

Process<br />

Step 10<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Step 10<br />

There are often m<strong>is</strong>match between ambition level and finances. The finance model should be decided in a very<br />

early phase of <strong>the</strong> project. Who will finance <strong>the</strong> project? Are <strong>the</strong>re any support funds that can help founding?<br />

Will <strong>the</strong> rental income increase? How much? How long <strong>is</strong> <strong>the</strong> payback time on <strong>the</strong> different measures? Which<br />

will be <strong>the</strong> major costs? Which functions are absolutely necessary <strong>to</strong> improve, and what will It cost? To define<br />

your ambition level on <strong>the</strong> different sustainable indica<strong>to</strong>rs, please download <strong>the</strong> SURE-<strong>to</strong>ol by clicking on <strong>the</strong><br />

but<strong>to</strong>n ‘Define ambitions’ . In <strong>the</strong> next step of <strong>the</strong> Guideline, you will create a performance profile of <strong>the</strong><br />

building, using <strong>the</strong> same <strong>to</strong>ol. The performance profile should <strong>the</strong>reafter be compared <strong>to</strong> <strong>the</strong> ambition level <strong>to</strong><br />

reveal <strong>the</strong> most challenging measures for refurb<strong>is</strong>hment.<br />

Finance models<br />

Plot opportunities<br />

Life Cycle Cost<br />

Support funds<br />

Area efficiency<br />

Rental income<br />

Increased value<br />

Change layout?<br />

Add a floor?<br />

Sell or Use?<br />

Let an expert explain<br />

(click here)<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

There <strong>is</strong> no use of planning a refurb<strong>is</strong>hment without knowing <strong>the</strong> performance profile of <strong>the</strong> building.<br />

Therefore, a survey should be conducted in a very early phase of <strong>the</strong> project. An example of a performance<br />

profile <strong>is</strong> shown below. Please use <strong>the</strong> SURE-<strong>to</strong>ol presented in step 3 (click <strong>the</strong> but<strong>to</strong>n ‘Create performance<br />

profile’) <strong>to</strong> create a performance profile of your building.<br />

Step 4<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Step 10<br />

Let an expert explain<br />

(click here)<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

The performance profile should be compiled with <strong>the</strong> project ambitions(using <strong>the</strong> SURE-<strong>to</strong>ol) and finances.<br />

Th<strong>is</strong> will reveal which measures <strong>to</strong> focus on, and give an indication on whe<strong>the</strong>r <strong>to</strong> tear down or refurb<strong>is</strong>h <strong>the</strong><br />

building. If it`s concluded <strong>to</strong> refurb<strong>is</strong>h <strong>the</strong> building, <strong>the</strong> ambitions should be rev<strong>is</strong>ed based on <strong>the</strong> analys<strong>is</strong>.<br />

Thereafter, a priority l<strong>is</strong>t on measures should be conducted. Please use <strong>the</strong> same <strong>to</strong>ol as in step 3 & 4 <strong>to</strong><br />

compare ambitions and performance profile.<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Step 10<br />

Let an expert explain<br />

(click here)<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

You are here<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Let an expert explain<br />

(click here)<br />

Step 10<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Based on <strong>the</strong> strategic analys<strong>is</strong> including finances, performance profile and ambition level, it`s now decided <strong>to</strong><br />

refurb<strong>is</strong>h <strong>the</strong> building. (If <strong>the</strong> dec<strong>is</strong>ion <strong>is</strong> <strong>to</strong> tear down <strong>the</strong> building, <strong>the</strong> guideline ends here). The ambition level<br />

has been rev<strong>is</strong>ed and a priority l<strong>is</strong>t on measures <strong>is</strong> finalized. Now, <strong>the</strong> planners have <strong>to</strong> set targets on <strong>the</strong><br />

sustainable indica<strong>to</strong>rs evaluated in <strong>the</strong> performance profile. The targets should be quantitative, as far as<br />

possible. They should also reflect ambitiousness, available finances and technical, real<strong>is</strong>tic measures. Please<br />

use <strong>the</strong> same SURE-<strong>to</strong>ol as in step 3, 4 & 5 <strong>to</strong> set requirements and create a Quality Program for Sustainable<br />

Refurb<strong>is</strong>hment (QPSR).<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Step 10<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

One of <strong>the</strong> most challenging tasks in a refurb<strong>is</strong>hment project <strong>is</strong> “<strong>to</strong> find <strong>the</strong> right guy for <strong>the</strong> job”. It`s all about<br />

selecting <strong>the</strong> right expert teams <strong>to</strong> handle <strong>the</strong> different phases of <strong>the</strong> project. Sometimes <strong>the</strong> same team can<br />

be used in several phases, maybe also throughout <strong>the</strong> whole project, but anyhow <strong>the</strong>re must be a team<br />

selection in at least <strong>the</strong> following 8 phases; 1. Condition survey, 2. Create a performance profile, 3. Strategic<br />

analys<strong>is</strong> (<strong>to</strong>ge<strong>the</strong>r with <strong>the</strong> building owner), 4. Early design , 5.Design, 6. Construction, 7. Operation and<br />

maintenance, 8. Moni<strong>to</strong>ring, enforcement and evaluation. Each of <strong>the</strong> selection processes should include a<br />

description of <strong>the</strong> task, criteria for <strong>the</strong> selection, a tender request, tender evaluation and contracting. An<br />

example of requirement setting for selecting a team <strong>is</strong> shown on <strong>the</strong> figure below.<br />

Requirement category Description Example<br />

Qualification requirements<br />

Award criteria:<br />

Requirements <strong>to</strong> <strong>the</strong> provider who wants <strong>to</strong><br />

participate in <strong>the</strong> contest. If <strong>the</strong> provider does not<br />

meet <strong>the</strong> qualification requirements, he <strong>is</strong><br />

rejected.<br />

Criteria <strong>to</strong> choose <strong>the</strong> most favorable offer, i.e.<br />

which provider should be chosen.<br />

Tax and duty matters are ok.<br />

The provider has experience from similar<br />

m<strong>is</strong>sions.<br />

The quality system of <strong>the</strong> provider <strong>is</strong><br />

sat<strong>is</strong>fac<strong>to</strong>ry.<br />

Cost 50 %<br />

Experiences 25 %<br />

Understanding of <strong>the</strong> task 25 %<br />

Step 10<br />

Specification requirements: Requirements for <strong>the</strong> deliveries. Design a passive house standard<br />

Install a heat pump with detailed<br />

specifications<br />

Waste management specifications<br />

Insulation thickness in <strong>the</strong> wall<br />

Let an expert explain<br />

(click here)<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Even if <strong>the</strong> Quality Program for Sustainable Refurb<strong>is</strong>hment (QPSR) <strong>is</strong> well documented and decided, <strong>the</strong><br />

program will not implement itself in<strong>to</strong> <strong>the</strong> different processes of <strong>the</strong> refurb<strong>is</strong>hment project. Therefore, it <strong>is</strong> of<br />

high importance that an evaluation of <strong>the</strong> quality program <strong>is</strong> required in all <strong>the</strong> phases of <strong>the</strong> project. The<br />

project management should impose <strong>the</strong> designers and contrac<strong>to</strong>rs <strong>to</strong> review <strong>the</strong> QPSR (checkl<strong>is</strong>t) <strong>to</strong> ensure<br />

that <strong>the</strong> sustainable indica<strong>to</strong>r requirements are addressed. In <strong>the</strong> Hand Over phase, <strong>the</strong> building owner and <strong>the</strong><br />

contrac<strong>to</strong>r should check <strong>the</strong> QPSR <strong>to</strong>ge<strong>the</strong>r. Last, but not least, <strong>the</strong> operating personnel should have strict<br />

guidelines on regularly checks and evaluations during <strong>the</strong> whole operational phase.<br />

Step 5<br />

Step 6<br />

Design<br />

Check & Evaluate<br />

Step 7<br />

Step 8<br />

Step 9<br />

Construction<br />

Hand Over<br />

Check & Evaluate<br />

Check & Evaluate<br />

Step 10<br />

Operation<br />

Check & Evaluate<br />

Let an expert explain<br />

(click here)<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

You are here<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Let an expert explain<br />

(click here)<br />

Step 10<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

When <strong>the</strong> requirements in <strong>the</strong> Quality Program of Sustainable Refurb<strong>is</strong>hment (QPSR) <strong>is</strong> evaluated in <strong>the</strong><br />

different phases of <strong>the</strong> project, <strong>the</strong>y could prove <strong>to</strong> be incorrect. In that case, <strong>the</strong> designer, <strong>the</strong> contrac<strong>to</strong>r, <strong>the</strong><br />

building owner or <strong>the</strong> operating personnel need an action plan <strong>to</strong> know how <strong>to</strong> act <strong>to</strong> improve <strong>the</strong><br />

performance of <strong>the</strong> indica<strong>to</strong>r. Th<strong>is</strong> <strong>is</strong> <strong>the</strong> only way <strong>to</strong> ensure high quality on <strong>the</strong> sustainable indica<strong>to</strong>rs of <strong>the</strong><br />

building. The figure below shows examples of how th<strong>is</strong> could be implemented in <strong>the</strong> QPSR.<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Indica<strong>to</strong>r<br />

Delivered energy<br />

Target value<br />

(QPSR)<br />

Current value<br />

(checked)<br />

80 kWh/m 2 y 120 kWh/m 2 y<br />

Action if m<strong>is</strong>match in design phase<br />

Rev<strong>is</strong>e <strong>the</strong> energy calculation<br />

- More insulation<br />

- Solar shading<br />

- Reduce ventilation rate<br />

- Increase heat recovery<br />

- Energy system<br />

- Energy source<br />

Step 10<br />

CO 2 -consentration<br />

Lux-level<br />

2000 ppm<br />

500lux<br />

1000 ppm<br />

300 lux<br />

Increase ventilation<br />

Change lighting system<br />

Increase window area<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

You are here<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Let an expert explain<br />

(click here)<br />

Step 10<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next


Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

Step 6<br />

In <strong>the</strong> operational phase, <strong>the</strong> sustainable indica<strong>to</strong>rs in <strong>the</strong> QPSR should be moni<strong>to</strong>red continuously. But even if<br />

<strong>the</strong> performance of <strong>the</strong> building and its technical equipment fulfils <strong>the</strong> requirements, <strong>the</strong> behavior of <strong>the</strong> users<br />

could have a huge impact on <strong>the</strong> performance. Often, a sustainable refurb<strong>is</strong>hed building turns out <strong>to</strong> be<br />

unsustainable because of wrong use. Therefore, detailed user guidelines <strong>to</strong>ge<strong>the</strong>r with moni<strong>to</strong>ring and<br />

involving, should be implemented in<strong>to</strong> <strong>the</strong> operating procedures of <strong>the</strong> building, e.g. as exemplified here.<br />

User guidelines<br />

Waste:<br />

-Paper, plastic and organic waste<br />

should be sorted in each floor<br />

Step 7<br />

Step 8<br />

Step 9<br />

Step 10<br />

Moni<strong>to</strong>ring<br />

Involving<br />

Energy:<br />

- Energy consumption <strong>is</strong><br />

d<strong>is</strong>played in reception area<br />

Indoor climate:<br />

- The user can report<br />

unsat<strong>is</strong>fac<strong>to</strong>ry indoor climate<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©