Sustainability is the capacity to endure. This involves both ...
Sustainability is the capacity to endure. This involves both ...
Sustainability is the capacity to endure. This involves both ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Step 1<br />
Step 2<br />
Step 3<br />
Step 4<br />
The performance profile should be compiled with <strong>the</strong> project ambitions(using <strong>the</strong> SURE-<strong>to</strong>ol) and finances.<br />
Th<strong>is</strong> will reveal which measures <strong>to</strong> focus on, and give an indication on whe<strong>the</strong>r <strong>to</strong> tear down or refurb<strong>is</strong>h <strong>the</strong><br />
building. If it`s concluded <strong>to</strong> refurb<strong>is</strong>h <strong>the</strong> building, <strong>the</strong> ambitions should be rev<strong>is</strong>ed based on <strong>the</strong> analys<strong>is</strong>.<br />
Thereafter, a priority l<strong>is</strong>t on measures should be conducted. Please use <strong>the</strong> same <strong>to</strong>ol as in step 3 & 4 <strong>to</strong><br />
compare ambitions and performance profile.<br />
Step 5<br />
Step 6<br />
Step 7<br />
Step 8<br />
Step 9<br />
Step 10<br />
Let an expert explain<br />
(click here)<br />
Finance and<br />
Procurement<br />
Strategy<br />
Requirement<br />
Setting<br />
Selecting<br />
<strong>the</strong> Team<br />
Managing<br />
<strong>the</strong> Supply<br />
Operation<br />
and<br />
Maintenance<br />
Moni<strong>to</strong>ring,<br />
Enforcement<br />
and Evaluation<br />
©<br />
Next