24.06.2014 Views

Sustainability is the capacity to endure. This involves both ...

Sustainability is the capacity to endure. This involves both ...

Sustainability is the capacity to endure. This involves both ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

When <strong>the</strong> requirements in <strong>the</strong> Quality Program of Sustainable Refurb<strong>is</strong>hment (QPSR) <strong>is</strong> evaluated in <strong>the</strong><br />

different phases of <strong>the</strong> project, <strong>the</strong>y could prove <strong>to</strong> be incorrect. In that case, <strong>the</strong> designer, <strong>the</strong> contrac<strong>to</strong>r, <strong>the</strong><br />

building owner or <strong>the</strong> operating personnel need an action plan <strong>to</strong> know how <strong>to</strong> act <strong>to</strong> improve <strong>the</strong><br />

performance of <strong>the</strong> indica<strong>to</strong>r. Th<strong>is</strong> <strong>is</strong> <strong>the</strong> only way <strong>to</strong> ensure high quality on <strong>the</strong> sustainable indica<strong>to</strong>rs of <strong>the</strong><br />

building. The figure below shows examples of how th<strong>is</strong> could be implemented in <strong>the</strong> QPSR.<br />

Step 5<br />

Step 6<br />

Step 7<br />

Step 8<br />

Step 9<br />

Indica<strong>to</strong>r<br />

Delivered energy<br />

Target value<br />

(QPSR)<br />

Current value<br />

(checked)<br />

80 kWh/m 2 y 120 kWh/m 2 y<br />

Action if m<strong>is</strong>match in design phase<br />

Rev<strong>is</strong>e <strong>the</strong> energy calculation<br />

- More insulation<br />

- Solar shading<br />

- Reduce ventilation rate<br />

- Increase heat recovery<br />

- Energy system<br />

- Energy source<br />

Step 10<br />

CO 2 -consentration<br />

Lux-level<br />

2000 ppm<br />

500lux<br />

1000 ppm<br />

300 lux<br />

Increase ventilation<br />

Change lighting system<br />

Increase window area<br />

Finance and<br />

Procurement<br />

Strategy<br />

Requirement<br />

Setting<br />

Selecting<br />

<strong>the</strong> Team<br />

Managing<br />

<strong>the</strong> Supply<br />

Operation<br />

and<br />

Maintenance<br />

Moni<strong>to</strong>ring,<br />

Enforcement<br />

and Evaluation<br />

©<br />

Next

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!