slides here - Algonquin Power & Utilities Corp.
slides here - Algonquin Power & Utilities Corp.
slides here - Algonquin Power & Utilities Corp.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Capital Project Management<br />
Reduce Risk Over Project Life Cycle<br />
Title<br />
Stage<br />
Gate<br />
Activity<br />
Needed<br />
Funds<br />
Engineering<br />
Completion<br />
Contingency<br />
Required<br />
Porch<br />
Gat te 0 – Th he Front<br />
Stage 1 Stage 2 Stage 3 Stage 4<br />
Project Options Project<br />
Screening Selection Refinement<br />
Conceptual<br />
Study<br />
Ga ate 1<br />
Feasibility<br />
Study<br />
Ga ate 2<br />
Engineering<br />
Study<br />
Up to 0.1% Up to 0.5% Up to 1.5%<br />
Ga ate 3<br />
Execution<br />
Detailed Eng.<br />
& Construction<br />
100% of<br />
Engineering Value<br />
0-5% 5-20% 30-40% 50-100%<br />
30-50% 15-20% 10-15%<br />
• Risk managed process from business plan to start-up (Stage 1 – Stage 4)<br />
• Approval stage gates across the project life cycle (Gate 0 – Gate 3)<br />
• Owner reviews deliverables at each gate; management can modify / stop project<br />
• Project funding is tightly managed<br />
31