2012 CAPEX Plan and Progress<br />

Project<br />

• Sanger - Transformer upgraded, new STG installed<br />

• PPA amended to manage carbon risk through 2013<br />

• Preparing capital plan to support PPA negotiations with<br />

PG&E for 16 MW additional capacity<br />

• Windsor Locks - Repowering complete in Q3 2012<br />

• ESA extended through 2027 with Ahlstrom<br />

• Frame 6 & STG successfully bid into ISONE Reserve Market<br />

Expected<br />

Impact<br />

EBITDA increase:<br />

- $500k (2013)<br />

- $500k (2014)<br />

EBITDA:<br />

- $2.5 – $3MM<br />

• Tinker<br />

• G5 repowering underway expected completion Fall 2012<br />

• Increase output & reduce operating costs<br />

−<br />

−<br />

24 GWh/year<br />

of increased<br />

generation<br />

EBITDA<br />

increase:<br />

$750k/year<br />

35