5.2 METHODOLOGY FOR TECHNICAL STUDY<br />
Following captive power plants were selected jointly by CSERC and CSEB for detailed study:<br />
Sr.<br />
No.<br />
Name of selected<br />
captive power plants<br />
Table-V<br />
Total Installed<br />
Capacity in MW<br />
Total Installed<br />
Capacity in MVA<br />
C<strong>on</strong>tract demand<br />
with CSEB in MVA<br />
1 P 810<br />
993.1<br />
120<br />
2 Q 325.7<br />
364.6<br />
1<br />
3 R 20<br />
25.0<br />
1.8<br />
4 S 55<br />
68.8<br />
10<br />
5 T 21.5<br />
26.9<br />
8<br />
6 U 14.3<br />
16.0<br />
2.75<br />
7 V 15<br />
19.6<br />
6<br />
8 W 43<br />
57.8<br />
3.125<br />
9 X NA<br />
0.0<br />
16<br />
10 Y 15<br />
18.7<br />
2<br />
TOTAL 1319.5 1590.5 170.68<br />
It was jointly decided to carry out measurement at the point of comm<strong>on</strong> coupling with<br />
(a) Grid interc<strong>on</strong>necti<strong>on</strong>( <strong>parallel</strong> operating c<strong>on</strong>diti<strong>on</strong>)<br />
(b) Without grid interc<strong>on</strong>necti<strong>on</strong> (Islanding operating c<strong>on</strong>diti<strong>on</strong>)<br />
But ERDA was not granted permissi<strong>on</strong> for measurements in islanding mode as the CPPs<br />
expressed their inability to run in isolated mode. Hence, ERDA has carried out the<br />
measurements at following two locati<strong>on</strong>s as jointly decided -<br />
(1) Point of comm<strong>on</strong> coupling, and<br />
(2) Generator output terminals.<br />
ERDA has carried out measurements for 24 hours at above menti<strong>on</strong>ed locati<strong>on</strong>s for the<br />
selected CPPs. Technical report of the results of the measurements has been submitted to the<br />
Commissi<strong>on</strong>. The highlights of the study results observed from measurements and power<br />
system studies are given in clause 5.3.<br />
ERDA has also collected required data for power system studies from the transmissi<strong>on</strong> divisi<strong>on</strong><br />
of CSEB for carrying out the load flow and fault level calculati<strong>on</strong>.<br />