(4) Captive power plants will have higher fault level support when they are c<strong>on</strong>nected in<br />

<strong>parallel</strong> with the grid supply (Table-VI). Because of the higher fault level, the voltage<br />

drop will be less in the system.<br />

(5) Additi<strong>on</strong>al revenues can be generated by the CPPs by sale of surplus power to utility<br />

grid (fig.11) which could attract new investments in CPP.<br />

In additi<strong>on</strong> to above, CPPs enjoy the following advantages also:<br />

(1) In case of fault in CPP generating units or other equipment, bulk c<strong>on</strong>sumers can draw<br />

the required power from the grid and can save their producti<strong>on</strong> loss.<br />

(2) The shock and disturbances in the generating units and also of industries are absorbed<br />

by the grid system which is very large (infinite bus).<br />

(3) The grid provides stability to the plant to start heavy loads like HT motors.<br />

(4) The variati<strong>on</strong> in the voltage and frequency at the time of starting large motors and heavy<br />

loads is minimized in the industry, as the grid supply acts as an infinite bus.<br />

(5) The impact created by sudden load throw off and c<strong>on</strong>sequent tripping of CPP generator<br />

<strong>on</strong> over speeding is avoided with the grid taking care of the impact.<br />

(6) The transient surges reduce the life of equipment of CPP. In some cases the equipment<br />

fails if transient is bey<strong>on</strong>d limit. If the system is c<strong>on</strong>nected to the grid, however, the grid<br />

absorbs the transient. Hence grid enhances the life of CPP equipments.<br />

In short, for smooth operati<strong>on</strong> of industry and generator, CPPs gain is manifold in case there is<br />

grid support from the utility.<br />

5.6 ADVANTAGE OF PARALLEL OPERATION TO UTILITY<br />

(1) Power generated by captive power plants (bulk c<strong>on</strong>sumers) partially bridges the gap<br />

between demand and supply because there is a gap between generati<strong>on</strong> and demand in<br />

most of the States in the country.<br />

(2) Fault level of both the grid and CPP improves due to <strong>parallel</strong> operati<strong>on</strong> of captive power<br />

plant c<strong>on</strong>nected with the grid. However, the fault level c<strong>on</strong>tributi<strong>on</strong> by CPP units is less<br />

as compared to the c<strong>on</strong>tributi<strong>on</strong> of grid.<br />

(3) CPP takes power from the grid at very low load factor with respect to its c<strong>on</strong>tract<br />

demand, which results in high diversity. The demand <strong>charge</strong> is recovered from the<br />

c<strong>on</strong>sumers irrespective of diversity and also results in lower per MVA investment cost.<br />