5.3.4 ACTIVE POWER<br />

Fig.7 Active Power at point of comm<strong>on</strong> coupling<br />

Fig.8 Active Power at generator output<br />

Fig. 7 and Fig. 8 show the variati<strong>on</strong> in the Active Power measured at the point of comm<strong>on</strong><br />

coupling (132 kV) and at generator output terminal respectively for a typical captive power plant.<br />

It is found that variati<strong>on</strong> in the active power at point of comm<strong>on</strong> coupling is higher than that at<br />

generator output terminal. The CPP generator operates at c<strong>on</strong>stant power mode operati<strong>on</strong> and<br />

grid takes care for the variati<strong>on</strong> in the demand required by CPP loads thereby providing the<br />

support required by CPP.<br />