these pollutants. It is also observed that these c<strong>on</strong>sumers maintain very low c<strong>on</strong>tract demand<br />

with the utility as compared to the c<strong>on</strong>sumers without CPP. This is also <strong>on</strong>e of the important<br />

reas<strong>on</strong>s why grid support <strong>charge</strong>/POC is necessary for bulk c<strong>on</strong>sumers with CPP. Parallel<br />

operati<strong>on</strong> <strong>charge</strong>s <strong>on</strong> CD c<strong>on</strong>tracted from the utility and power export to the grid system of the<br />

utility may be exempted from the total <strong>parallel</strong> operati<strong>on</strong> <strong>charge</strong>s <strong>on</strong> the installed capacity of the<br />

CPP, so as to encourage CPPs to be able to export maximum possible power to the grid. So it<br />

can be c<strong>on</strong>cluded that CPP must c<strong>on</strong>tribute some reas<strong>on</strong>able <strong>charge</strong> in the form of POC.<br />

In view of the above, the Commissi<strong>on</strong> is of the view that as recommended by the ERDA,<br />

evaluati<strong>on</strong> of Parallel Operati<strong>on</strong> Charges by Base MVA method seems to be technically sound<br />

and justified and this method is most suitable for both utility as well as CPPs.<br />