1.4 DEFINITIONS<br />

MSSP - Manufacturers Standards Society of the Valve and Fittings Industry<br />

NEC - National Electrical Code<br />

NEMA - National Electrical Manufacturers Association<br />

NFPA - National Fire Protection Association<br />

OSHA - Occupational Safety and Health Administration<br />

TEMA - Tubular Exchanger Manufacturers Association<br />

UL - Underwriters' Laboratories<br />

A. Products: Items purchased for incorporating into the Work, whether purchased for Project<br />

or taken from previously purchased stock. The term product includes the terms material,<br />

equipment, system, and terms of similar intent.<br />

B. Substitutions: Changes proposed by Contractor in products, materials, equipment, and<br />

methods of construction required by the Contract Documents.<br />

1.5 SYSTEM DESCRIPTION<br />

A. Design Requirements: Contract drawings are generally diagrammatic and do not indicate<br />

all offsets, fittings, transitions, access panels and other specialties required.<br />

1.6 SUBMITTALS<br />

1. Furnish and install all items as may be required to fit the work to the conditions<br />

encountered.<br />

2. Arrange piping, equipment and other work generally as shown on the contract<br />

drawings, providing proper clearances and access.<br />

3. Where departures are proposed because of field conditions or other causes,<br />

prepare and submit detailed shop drawing submittal for approval in accordance<br />

with Submittals specified below.<br />

4. Subject to the provisions of Division 1, Architect may make reasonable changes<br />

in location of equipment piping up to the time of rough-in or fabrication.<br />

A. Comply with Section "Submittal Procedures."<br />

B. Shop Drawings and Product Data:<br />

1. Clearly identify all submittals:<br />

a. Indicate intended application, location, etc.<br />

b. Each submittal shall indicate the associated specification section, and<br />

paragraphs. Do not combine product data and shop drawing submittals<br />

from different spec sections into a single submittal package, even though<br />

they may be the same distributor, vendor or part of a single material<br />

order.<br />

c. Clearly indicate the exact type, model number, size and special features<br />

of the proposed item.<br />

d. <strong>Inc</strong>lude catalog spec sheets to completely describe proposed equipment.<br />

e. Factory order forms only showing the required capacities are not<br />

acceptable.<br />

f. Identify all options furnished to meet specifications.<br />

g. If product is within system supplying fixture intended to dispense potable<br />

water for human consumption, including drinking and cooling, submittals<br />

shall indicate that product is “lead free”, containing not more than a<br />

weighted average of 0.25% lead with respect to the wetted surfaces.<br />

h. Solder and flux for soldered joints in potable water piping shall be “lead<br />

EASTERN DISTRICT POLICE STATION 15050- 2 COMMON WORK RESULTS FOR PLUMBING<br />

28103.01 January 15, 2013