3. Remove and replace Work not conforming to requirements of the Contract<br />

Documents.<br />

4. Remove samples of installed Work as specified for testing.<br />

5. Install equipment and materials in existing structures.<br />

6. Upon written instructions from the Architect, uncover and restore Work to provide<br />

for Architect observation of concealed Work.<br />

C. Cut, remove and legally dispose of selected mechanical equipment, components, and<br />

materials as indicated, including but not limited to removal of mechanical piping, heating<br />

units, plumbing fixtures and trim, and other mechanical items made obsolete by the new<br />

Work.<br />

D. Protect the structure, furnishings, finishes, and adjacent materials not indicated or<br />

scheduled to be removed.<br />

E. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread<br />

of dust and dirt to adjacent areas.<br />

F. Patch finished surfaces and building components using new materials specified for the<br />

original installation and using experienced Installers. Installers' qualifications refer to the<br />

materials and methods required for the surface and building components being patched.<br />

3.4 PAINTING AND FINISHING<br />

A. Refer to Section "Interior Painting” for field painting requirements.<br />

B. Damage and Touch Up: Repair marred and damaged factory-painted finishes with<br />

materials and procedures to match original factory finish.<br />

C. Do not paint manufacturer's labels or tags.<br />

3.5 PENETRATION OF WATERPROOF CONSTRUCTION<br />

A. Coordinate the work to minimize penetration of waterproof construction, including roofs,<br />

exterior walls and interior waterproof construction.<br />

B. Furnish and install drains, curbs, vent assemblies, sleeves, flashing, etc. specifically<br />

designed for application to the particular construction. Install system in accordance with<br />

the roofing manufacturer's instructions.<br />

3.6 EXCAVATION AND BACKFILLING<br />

A. General<br />

3.7 CLEANING<br />

1. Perform all necessary excavation, for installation of work under Division 15, in<br />

accordance with Division 2.<br />

A. Clean surfaces prior to application of insulation, adhesives, coating, and paint.<br />

B. Provide factory applied finish where specified.<br />

C. Protect all finishes, and restore all finishes to their original condition if damaged as a<br />

result of work under Division 15.<br />

EASTERN DISTRICT POLICE STATION 15050- 10 COMMON WORK RESULTS FOR PLUMBING<br />

28103.01 January 15, 2013