05.08.2014 Views

Volume II (pdf) - Milestone Construction Services, Inc

Volume II (pdf) - Milestone Construction Services, Inc

Volume II (pdf) - Milestone Construction Services, Inc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. Submit complete descriptive data for all materials as follows:<br />

a. Material specifications.<br />

b. Data sheets.<br />

c. Samples.<br />

d. Capacity ratings.<br />

e. Performance curves.<br />

f. Operating characteristics.<br />

g. Catalog cuts.<br />

h. Dimensional drawings.<br />

i. Wiring diagrams.<br />

j. Installation instruction.<br />

k. Any other information necessary to indicate compliance with contract<br />

documents.<br />

l. Lead Free, for potable water service.<br />

2. Edit submittal data specifically for application to this project.<br />

3. Submit actual operating conditions and characteristics for all equipment.<br />

4. Catalogs or catalog cuts are not acceptable unless the particular item and all<br />

relative data has been marked in such a manner as to be clearly defined.<br />

5. Color of finishes shall be as selected by the Architect. Submit colors of factory<br />

finished equipment for acceptance prior to ordering.<br />

6. No mechanical item shall be fabricated, purchased, delivered to the site or<br />

installed, until reviewed by the Architect.<br />

a. After the proposed materials have been approved, no substitution will be<br />

permitted except where approved by the Architect.<br />

7. Provide the following shop drawing and product data submittals in addition to<br />

submittals required under individual specification sections.<br />

1.7 QUALITY ASSURANCE<br />

Items and Systems:<br />

Drains - Floor, Roof, Etc.<br />

Pipes, Valves, Fittings and Accessories<br />

Thermometers and Gauges<br />

Thermal Insulation Materials<br />

Back Flow Preventors<br />

Expansion Compensators<br />

Expansion Tanks<br />

Flexible Connections<br />

Cleanouts<br />

Pressure Relief Valves<br />

Pipes, Guides, Sleeves, Anchors and Supports<br />

Piping Equipment Supports<br />

Pipe Leakage Reports<br />

Plumbing Fixtures<br />

Balancing Reports<br />

Brazing and Soldering Procedures<br />

Lubricants and Instructions Record and Information Booklet<br />

Piping Cleaning Materials<br />

Gas fired Water Heaters<br />

Sump Pump<br />

Recirculation Pumps<br />

Any other equipment requested by the Architect.<br />

A. Underwriter’s Laboratory (UL) Requirements: All equipment containing electrical<br />

components and provided under Division 15 shall bear the Underwriter’s Laboratory (UL)<br />

EASTERN DISTRICT POLICE STATION 15050- 4 COMMON WORK RESULTS FOR PLUMBING<br />

28103.01 January 15, 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!