05.08.2014 Views

Volume II (pdf) - Milestone Construction Services, Inc

Volume II (pdf) - Milestone Construction Services, Inc

Volume II (pdf) - Milestone Construction Services, Inc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

access are concealed behind finished surfaces.<br />

H. Coordinate installation of identifying devices after completing covering and painting where<br />

devices are applied to surfaces. Install identifying devices prior to installing acoustical<br />

ceilings and similar concealment.<br />

1.9 DISCREPANCIES<br />

A. Where discrepancies occur between the drawings and specifications or within either<br />

document itself, the item or arrangement of better quality, greater quantity or higher cost<br />

shall be included in the contract price. The Architect shall decide on the item and manner<br />

in which the work shall be provided, based on the design intent of the documents.<br />

1.10 ELECTRONIC CAD DOCUMENTS<br />

A. Requests for electronic CAD documents will be accommodated to the contractors and<br />

installers upon their completion of Kibart’s electronic document release of liability form<br />

and payment for time and expense for document preparation.<br />

1. Kibart’s document preparation fee is as follows:<br />

a. Two hundred and fifty dollars ($250.00) for the first five (5) drawings.<br />

b. Fifty dollars ($50.00) for each drawing thereafter.<br />

PART 2<br />

PRODUCTS<br />

2.1 PRODUCT SELECTION<br />

A. General Product Requirements: Provide products that comply with Contract Documents<br />

that are undamaged and new at time of installation.<br />

1. Provide products complete with accessories, trim, finish, safety guards, and other<br />

devices and details needed for complete installation and intended use and effect.<br />

2. Standard Products: Where available, provide standard products of types that<br />

have been produced and used successfully in similar situations on other projects.<br />

3. Where products are accompanied by the term as selected, Architect will make<br />

selection.<br />

4. Where products are accompanied by the term match sample, sample to be<br />

matched is Architect's.<br />

5. Descriptive, performance, and reference standard requirements in the<br />

Specifications establish salient characteristics of products.<br />

B. General Compliance Requirements: Compliance requirements for individual products, as<br />

indicated in Contract Documents, are multiple in nature and may include generic<br />

descriptions, performance requirements, compliance with reference standards,<br />

conformance with graphic details and other similar forms and methods of indicating<br />

requirements, all of which must be complied with.<br />

C. Procedures for Selecting Products: Contractor's options for selecting products are limited<br />

by Contract Document requirements, and are not controlled by industry traditions or<br />

procedures experienced by Contractor on previous construction projects.<br />

D. Products specified by Reference Standards, Codes and Regulations: Select from among<br />

products, which can be shown to comply with referenced documents.<br />

EASTERN DISTRICT POLICE STATION 15051 - 6 COMMON WORK RESULTS FOR HVAC<br />

28103.01 January 15, 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!