05.08.2014 Views

Volume II (pdf) - Milestone Construction Services, Inc

Volume II (pdf) - Milestone Construction Services, Inc

Volume II (pdf) - Milestone Construction Services, Inc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MOSHA - Maryland Occupational Safety and Health Administration<br />

MSSP - Manufacturers Standards Society of the Valve and Fittings<br />

Industry<br />

NEC - National Electrical Code<br />

NEMA - National Electrical Manufacturers Association<br />

NFPA - National Fire Protection Association<br />

OSHA - Occupational Safety and Health Administration<br />

SMACNA - Sheet Metal and Air Conditioning Contractors National<br />

Association<br />

TEMA - Tubular Exchanger Manufacturers Association<br />

UL - Underwriters' Laboratories<br />

1.4 DEFINITIONS<br />

A. Products: Items purchased for incorporating into the Work, whether purchased for Project<br />

or taken from previously purchased stock. The term product includes the terms material,<br />

equipment, system, and terms of similar intent.<br />

B. Substitutions: Changes proposed by Contractor in products, materials, equipment, and<br />

methods of construction required by the Contract Documents.<br />

1.5 SUBMITTALS<br />

A. Comply with Section "Submittal Procedures."<br />

B. Shop Drawings and Product Data:<br />

1. Clearly identify all submittals:<br />

a. Indicate intended application, location, etc.<br />

b. Each submittal shall indicate the associated specification section, and<br />

paragraphs. Do not combine product data and shop drawing submittals<br />

from different spec sections into a single submittal package, even though<br />

they may be the same distributor, vendor or part of a single material<br />

order.<br />

c. Clearly indicate the exact type, model number, size and special features<br />

of the proposed item.<br />

d. <strong>Inc</strong>lude catalog spec sheets to completely describe proposed equipment.<br />

e. Factory order forms only showing the required capacities are not<br />

acceptable.<br />

f. Identify all options furnished to meet specifications.<br />

g. The Architect shall not select equipment ratings and/or options.<br />

Submittals not properly marked shall be returned without review.<br />

C. Product Substitutions: Comply with requirements of Division 01.<br />

D. Comparable Products Submission:<br />

1. Document each request for a proposed comparable product with supporting data<br />

substantiating compliance of proposed product with Basis-of-Design product.<br />

2. Use the attached “Comparable Product Submittal Form” in addition to the<br />

requirements specified herein.<br />

3. Comparable products will not be reviewed without completion of the attached<br />

form.<br />

E. Closeout Submittals:<br />

EASTERN DISTRICT POLICE STATION 15051 - 2 COMMON WORK RESULTS FOR HVAC<br />

28103.01 January 15, 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!