06.09.2014 Views

VW 150-5 Workshop Manual - Zanshin

VW 150-5 Workshop Manual - Zanshin

VW 150-5 Workshop Manual - Zanshin

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- Ensure that the supports in the cylinder head are correctly seated.<br />

- Insert the clamping collar.<br />

Tightening torques:<br />

Injection lines = 25 Nm<br />

Screw for clamping collar = 25 Nm<br />

- Install the console with the accelerator lever position sender:<br />

⇒ page 20-11; Servicing throttle controls<br />

- Install the engine cover.<br />

Checking injectors<br />

V.A.G 1322<br />

These engines are fitted with 2-spring injectors. Injection of the fuel<br />

quantity is in two stages.<br />

If these injectors are damaged or defective, it is only possible to<br />

replace them; neither a pressure adjustment nor servicing are<br />

possible.<br />

Special tools, workshop equipment, test and measuring equipment<br />

and accessories required<br />

W00--1049<br />

♦ Injector tester V.A.G 1322 with pressure line V.A.G 1322/2<br />

Test condition<br />

Pressure gauge switched on<br />

23-37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!