13.09.2014 Views

t The California Surveyor - CLSA

t The California Surveyor - CLSA

t The California Surveyor - CLSA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

esolved. If resolution can not be<br />

achieved, the question should be addressed<br />

in the introduction with appropriate<br />

methods for determining each<br />

• discussed.<br />

Obviously a tremendous amount of research<br />

and discussion is needed to fully<br />

incorporate high-production GPS surveying<br />

techniques and GPS-derived<br />

orthometric heights into a comprehensive<br />

set of standards and specifications. Addressing<br />

these techniques and their<br />

viability within a revision to the existing<br />

standards will allow individuals and agencies<br />

to take advantage of their known<br />

benefits, and will encourage much needed<br />

efforts to better define their capability and<br />

limitations. We feel that the incorporation<br />

of these suggested revisions will help to<br />

support the integrity of the document as a<br />

valid guideline for modern geodetic surveying<br />

methods.<br />

•<br />

•<br />

This committee is charged with pursuing<br />

avenues to inform our membership<br />

regarding advances in surveying and mapping<br />

methods, and to explore areas where<br />

our knowledge and expertise can aid in the<br />

implementation of new technologies. To<br />

this goal, one of our efforts will be to collect<br />

information from our colleagues<br />

regarding the GPS standards and specifi-<br />

cations and to forward this to the FGCS<br />

for consideration. Our initial discussions<br />

I have revealed interest and opinions from<br />

individuals and agencies within as well as<br />

outside of <strong>CLSA</strong>. We hope that our input<br />

icill be found as helpful rather than complicating<br />

an already difficult issue.<br />

It is our sincere desire to encourage the<br />

development and use of appropriate standards<br />

and specifications for geodetic control<br />

networks. In no way do we wish to criticize<br />

the efforts of the FGCS. We fully recognize<br />

the limited resources of the subcommittee<br />

and the formidable task which is at hand.<br />

This discussion is presented to express our<br />

perception of a critical condition and to offer<br />

these suggestions together with our interest<br />

and support.<br />

Thank you for your attention to this<br />

subject.<br />

Greg Helmer, P.L.S.<br />

CALIFORNIA GPS PROJECT<br />

INDEX CONTEMPLATED<br />

Have you ever done a control project<br />

and afterwards found another control<br />

project had just been completed in your<br />

own backyard? Or have you ever examined<br />

local control and tried to work<br />

out an observation schedule that<br />

would allow you rationalize the packin<br />

to that 2nd order monument on the<br />

mountain top? Wouldn't it be great if<br />

you could find out who just surveyed<br />

those two dozen B net control points in<br />

your corner of the county?<br />

If so, perhaps you would be interested<br />

in the proposal set forth at the<br />

October 17,1992, meeting of the <strong>CLSA</strong><br />

Advanced Technologies Committee<br />

(ATC). <strong>The</strong> idea is to create a voluntary<br />

registry for GPS control projects<br />

within or adjacent to the State of <strong>California</strong>.<br />

At present several scenarios<br />

have been proffered for the form and<br />

content of just such an index. Some of<br />

the suggestions have been 1) an extensive<br />

and very complete database<br />

containing data such as locations, descriptions,<br />

coordinate values, control<br />

classifications and SPC zones of the<br />

points in a network, 2) a list of brief<br />

descriptions which contain the approximate<br />

latitude and longitude of the<br />

networks' centers, the number of<br />

points measured and the agency, firm<br />

or individual acting as contact for project<br />

information and 3) graphic<br />

tabulation of project envelopes on a<br />

map of the State which could be available<br />

in hardcopy or .dxf format.<br />

If you are interested in contributing to<br />

this central clearing house for GPS projects<br />

and /or have surveys that you feel<br />

would be of use in network densification,<br />

your ideas and comments would<br />

be greatly appreciated. Further, the<br />

ATC would be interested in your<br />

thoughts on presentation formats, data<br />

you would like to see be available (and<br />

data you would like to see NOT be<br />

available) along with any other pertinent<br />

information or helpful hints.<br />

Communiques need not be fancy: a<br />

post card will do.<br />

Please address all correspondence<br />

to:<br />

GPSINDX.ATC<br />

c/o Robert J. Reese, P.L.S.<br />

6423 Squire Canyon<br />

San Luis Obispo CA 93401<br />

You may FAX your information/<br />

ideas/comments after 1700 hrs PT. to:<br />

GPSINDX.ATC<br />

c/o Robert J. Reese, P.L.S.<br />

(805) 489-6723<br />

Your responses, contributions and<br />

ideas will be compiled and presented<br />

in a future <strong>California</strong> <strong>Surveyor</strong> article. ©<br />

NATIONAL<br />

NEWS<br />

August 27,1992<br />

Richard E. Lomax<br />

President, NSPS<br />

243 South Sheldon<br />

Charlotte, MI 48813<br />

Dear Mr. Lomax:<br />

I am pleased to advise you that the<br />

delegates to the NCEES 1992 Annual<br />

Meeting voted to ratify the<br />

membership of the National Society<br />

of Professional <strong>Surveyor</strong>s in<br />

the Participating Organizations Liaison<br />

Council (POLC). <strong>The</strong> membership<br />

is effective as of August<br />

13,1992.<br />

You indicated in your letter of<br />

March 1, 1992, that Ralph Harris<br />

has been designated as NSPS' representative<br />

to the POLC. Unless I<br />

hear otherwise, I will assume that<br />

Ralph will continue as the representative.<br />

<strong>The</strong> next meeting of the<br />

POLC is scheduled for March 13-<br />

14, 1993, at Salt Lake City, Utah.<br />

<strong>The</strong> site for the meeting has not<br />

been selected yet. <strong>The</strong> travel expenses<br />

for your representative to<br />

attend the meeting are the responsibility<br />

of NSPS.<br />

<strong>The</strong> annual membership fees<br />

for 1993 will be $200.00. NSPS will<br />

be billed for the fees in January<br />

1993.<br />

<strong>The</strong> NCEES Constitution and<br />

Bylaws, Policy Manual, and Model<br />

law were revised by the actions of<br />

the delegates at the 1992 Annual<br />

Meeting and the revised editions<br />

will be provided to NSPS headquarters<br />

and your representative<br />

as soon as they are available.<br />

NCEES looks forward to a long<br />

and mutually beneficial relationship<br />

with NSPS.<br />

Respectfully,<br />

Roger B. Stricklin, Jr.<br />

Executive Director, NCEES ©<br />

Winter 1993<br />

<strong>The</strong> <strong>California</strong> <strong>Surveyor</strong> 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!