t The California Surveyor - CLSA
t The California Surveyor - CLSA
t The California Surveyor - CLSA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
esolved. If resolution can not be<br />
achieved, the question should be addressed<br />
in the introduction with appropriate<br />
methods for determining each<br />
• discussed.<br />
Obviously a tremendous amount of research<br />
and discussion is needed to fully<br />
incorporate high-production GPS surveying<br />
techniques and GPS-derived<br />
orthometric heights into a comprehensive<br />
set of standards and specifications. Addressing<br />
these techniques and their<br />
viability within a revision to the existing<br />
standards will allow individuals and agencies<br />
to take advantage of their known<br />
benefits, and will encourage much needed<br />
efforts to better define their capability and<br />
limitations. We feel that the incorporation<br />
of these suggested revisions will help to<br />
support the integrity of the document as a<br />
valid guideline for modern geodetic surveying<br />
methods.<br />
•<br />
•<br />
This committee is charged with pursuing<br />
avenues to inform our membership<br />
regarding advances in surveying and mapping<br />
methods, and to explore areas where<br />
our knowledge and expertise can aid in the<br />
implementation of new technologies. To<br />
this goal, one of our efforts will be to collect<br />
information from our colleagues<br />
regarding the GPS standards and specifi-<br />
cations and to forward this to the FGCS<br />
for consideration. Our initial discussions<br />
I have revealed interest and opinions from<br />
individuals and agencies within as well as<br />
outside of <strong>CLSA</strong>. We hope that our input<br />
icill be found as helpful rather than complicating<br />
an already difficult issue.<br />
It is our sincere desire to encourage the<br />
development and use of appropriate standards<br />
and specifications for geodetic control<br />
networks. In no way do we wish to criticize<br />
the efforts of the FGCS. We fully recognize<br />
the limited resources of the subcommittee<br />
and the formidable task which is at hand.<br />
This discussion is presented to express our<br />
perception of a critical condition and to offer<br />
these suggestions together with our interest<br />
and support.<br />
Thank you for your attention to this<br />
subject.<br />
Greg Helmer, P.L.S.<br />
CALIFORNIA GPS PROJECT<br />
INDEX CONTEMPLATED<br />
Have you ever done a control project<br />
and afterwards found another control<br />
project had just been completed in your<br />
own backyard? Or have you ever examined<br />
local control and tried to work<br />
out an observation schedule that<br />
would allow you rationalize the packin<br />
to that 2nd order monument on the<br />
mountain top? Wouldn't it be great if<br />
you could find out who just surveyed<br />
those two dozen B net control points in<br />
your corner of the county?<br />
If so, perhaps you would be interested<br />
in the proposal set forth at the<br />
October 17,1992, meeting of the <strong>CLSA</strong><br />
Advanced Technologies Committee<br />
(ATC). <strong>The</strong> idea is to create a voluntary<br />
registry for GPS control projects<br />
within or adjacent to the State of <strong>California</strong>.<br />
At present several scenarios<br />
have been proffered for the form and<br />
content of just such an index. Some of<br />
the suggestions have been 1) an extensive<br />
and very complete database<br />
containing data such as locations, descriptions,<br />
coordinate values, control<br />
classifications and SPC zones of the<br />
points in a network, 2) a list of brief<br />
descriptions which contain the approximate<br />
latitude and longitude of the<br />
networks' centers, the number of<br />
points measured and the agency, firm<br />
or individual acting as contact for project<br />
information and 3) graphic<br />
tabulation of project envelopes on a<br />
map of the State which could be available<br />
in hardcopy or .dxf format.<br />
If you are interested in contributing to<br />
this central clearing house for GPS projects<br />
and /or have surveys that you feel<br />
would be of use in network densification,<br />
your ideas and comments would<br />
be greatly appreciated. Further, the<br />
ATC would be interested in your<br />
thoughts on presentation formats, data<br />
you would like to see be available (and<br />
data you would like to see NOT be<br />
available) along with any other pertinent<br />
information or helpful hints.<br />
Communiques need not be fancy: a<br />
post card will do.<br />
Please address all correspondence<br />
to:<br />
GPSINDX.ATC<br />
c/o Robert J. Reese, P.L.S.<br />
6423 Squire Canyon<br />
San Luis Obispo CA 93401<br />
You may FAX your information/<br />
ideas/comments after 1700 hrs PT. to:<br />
GPSINDX.ATC<br />
c/o Robert J. Reese, P.L.S.<br />
(805) 489-6723<br />
Your responses, contributions and<br />
ideas will be compiled and presented<br />
in a future <strong>California</strong> <strong>Surveyor</strong> article. ©<br />
NATIONAL<br />
NEWS<br />
August 27,1992<br />
Richard E. Lomax<br />
President, NSPS<br />
243 South Sheldon<br />
Charlotte, MI 48813<br />
Dear Mr. Lomax:<br />
I am pleased to advise you that the<br />
delegates to the NCEES 1992 Annual<br />
Meeting voted to ratify the<br />
membership of the National Society<br />
of Professional <strong>Surveyor</strong>s in<br />
the Participating Organizations Liaison<br />
Council (POLC). <strong>The</strong> membership<br />
is effective as of August<br />
13,1992.<br />
You indicated in your letter of<br />
March 1, 1992, that Ralph Harris<br />
has been designated as NSPS' representative<br />
to the POLC. Unless I<br />
hear otherwise, I will assume that<br />
Ralph will continue as the representative.<br />
<strong>The</strong> next meeting of the<br />
POLC is scheduled for March 13-<br />
14, 1993, at Salt Lake City, Utah.<br />
<strong>The</strong> site for the meeting has not<br />
been selected yet. <strong>The</strong> travel expenses<br />
for your representative to<br />
attend the meeting are the responsibility<br />
of NSPS.<br />
<strong>The</strong> annual membership fees<br />
for 1993 will be $200.00. NSPS will<br />
be billed for the fees in January<br />
1993.<br />
<strong>The</strong> NCEES Constitution and<br />
Bylaws, Policy Manual, and Model<br />
law were revised by the actions of<br />
the delegates at the 1992 Annual<br />
Meeting and the revised editions<br />
will be provided to NSPS headquarters<br />
and your representative<br />
as soon as they are available.<br />
NCEES looks forward to a long<br />
and mutually beneficial relationship<br />
with NSPS.<br />
Respectfully,<br />
Roger B. Stricklin, Jr.<br />
Executive Director, NCEES ©<br />
Winter 1993<br />
<strong>The</strong> <strong>California</strong> <strong>Surveyor</strong> 29