13.09.2014 Views

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Non-Main Track Hand Operated Switch<br />

A switch used to route equipment or a track unit within non-main track territory.<br />

Normal<br />

Position<br />

Reverse<br />

Position<br />

Note: Switch targets may be different shapes than illustrated but must not be<br />

diamond shape.<br />

Power-Operated Switch<br />

A switch equipped for powered operation, but not equipped for hand operation.<br />

Semi-Automatic Switch<br />

A non-main track switch equipped with an internal securing mechanism that<br />

permits equipment to trail through the switch points thus setting the switch for the<br />

route being used.<br />

Set for<br />

Normal<br />

Route<br />

Set for Other<br />

Than Normal<br />

Route<br />

Note: Switch targets must be diamond shaped.<br />

Spring Switch<br />

A switch equipped with a spring mechanism arranged to restore the switch points<br />

to normal position after having been trailed through.<br />

Switch<br />

A device used to route equipment or a track unit from one track to another.<br />

SPEEDS:<br />

DIVERGING Speed<br />

A speed not exceeding twenty five (25) miles per hour.<br />

LIMITED Speed<br />

A speed not exceeding forty five (45) miles per hour.<br />

-14-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!