13.09.2014 Views

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

psgr<br />

rpt<br />

R<strong>TC</strong><br />

SNS<br />

S<br />

sdg<br />

SI<br />

STK<br />

sub<br />

swt<br />

TGBO<br />

TIBS<br />

TOP<br />

trnm<br />

TU<br />

W<br />

wk<br />

xover<br />

xing<br />

Passenger<br />

Repeat<br />

<strong>Rail</strong> Traffic Controller<br />

Station Name Sign<br />

South<br />

Siding<br />

Special Instruction<br />

Subdivision Track<br />

Subdivision<br />

Switch<br />

Tabular General Bulletin Order<br />

Train Information Braking System<br />

Track Occupancy Permit<br />

Trainman<br />

Track Unit<br />

West<br />

Work<br />

Crossover<br />

Crossing<br />

R<strong>TC</strong> may use approved office abbreviations for station and subdivision<br />

names and for controlled points when entering addresses on computer<br />

generated forms. The normal abbreviations for days of the week and calendar<br />

months may be used.<br />

O In these rules when the distance prescribed for the placement of signals,<br />

signs or flags is not possible due to track configuration, the maximum<br />

distance available applies.<br />

-22-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!