13.09.2014 Views

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

Canadian Rail Operating Rules (CROR) TC O-0-93 - PDF

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7. NOTICE OF NEW TIME TABLE OR SUPPLEMENT<br />

Notice will be given by operating bulletin and posted at least seventy two (72)<br />

hours prior to a new time table or supplement taking effect. Notice will also be<br />

given by GBO at least twenty four (24) hours prior to the new time table or<br />

supplement taking effect and for not less than six (6) days after it takes effect.<br />

Notice must also be communicated to all other affected employees.<br />

8. SYMBOLS AND DIAGRAMS<br />

(a) The following symbols when used in the time table indicate:<br />

B <strong>Operating</strong> bulletins<br />

C Cautionary limits<br />

D Trains or Transfers report departure to R<strong>TC</strong><br />

S Special Derail<br />

X Crossover between main tracks<br />

Y Wye<br />

* See footnote<br />

+ Interlocking - see footnotes.<br />

(b) Method of control and the limits of single track or multi-track will be indicated<br />

in the time table.<br />

(c) The location of each interlocking, non-interlocked drawbridge and noninterlocked<br />

railway crossing at grade will be indicated in subdivision footnotes<br />

or special instructions.<br />

(d) Siding capacity and the extent of TGBO and DOB limits will be indicated in<br />

time table columns, to the side of the station column or in subdivision<br />

footnotes.<br />

-24-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!