ML193DF Gas Furnace Installation Manual - Lennox
ML193DF Gas Furnace Installation Manual - Lennox
ML193DF Gas Furnace Installation Manual - Lennox
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TABLE 2<br />
COMBUSTIBLE FLOORING BASE OPENING SIZE<br />
Cabinet<br />
Width<br />
Catalog<br />
Number<br />
Front to Rear<br />
Side to Side<br />
in. mm in. mm<br />
FURNACE<br />
B Cabinet<br />
(17.5")<br />
11M60 22 559 18 − 3/4 476<br />
C Cabinet<br />
(21")<br />
11M61 22 559 22 − 3/4 578<br />
PROPERLY<br />
SIZED FLOOR<br />
OPENING<br />
COOLING COIL<br />
PLENUM<br />
FURNACE<br />
SUPPLY AIR<br />
PLENUM<br />
PROPERLY<br />
SIZED FLOOR<br />
OPENING<br />
FIGURE 13<br />
COMBUSTIBLE<br />
FLOORING BASE<br />
2 − After opening is cut, set the combustible flooring base<br />
into opening.<br />
3 − Check fiberglass strips on the combustible flooring<br />
base to make sure they are properly glued and positioned.<br />
4 − Lower supply air plenum into the combustible flooring<br />
base until plenum flanges seal against fiberglass<br />
strips.<br />
NOTE − Be careful not to damage fiberglass strips.<br />
Check for a tight seal.<br />
5 − Set the furnace over the plenum.<br />
6 − Ensure that the seal between the furnace and plenum<br />
is adequate.<br />
<strong>Installation</strong> on Cooling Coil Cabinet Figure 14<br />
NOTE − Downflow combustible flooring kit is not used..<br />
1 − Refer to reverse−flow coil installation instructions for<br />
correctly sized opening in floor and installation of cabinet.<br />
2 − When cooling cabinet is in place, set and secure the<br />
furnace according to the instructions that are provided<br />
with the cooling coil. Secure the furnace to the cabinet.<br />
3 − Seal the cabinet and check for air leaks.<br />
FIGURE 14<br />
Return Air Opening −− Downflow Units<br />
Return air may be brought in only through the top opening<br />
of a furnace installed in the downflow position. The following<br />
steps should be taken when installing plenum:<br />
1 − Bottom edge of plenum should be flanged with a<br />
hemmed edge (See figure 15 or 16).<br />
2 − Sealing strips should be used to ensure an airtight seal<br />
between the cabinet and the plenum.<br />
3 − In all cases, plenum should be secured to top of furnace<br />
using sheet metal screws.<br />
4 − Make certain that an adequate seal is made.<br />
PLENUM<br />
(Field Provided)<br />
SEALING STRIP<br />
(Field Provided)<br />
PLENUM<br />
(Field Provided)<br />
SECURE FROM<br />
INSIDE CABINET<br />
ÉÉÉÉ<br />
Side View<br />
FIGURE 15<br />
Side View<br />
ÉÉÉÉ<br />
FIGURE 16<br />
SECURE FROM<br />
OUTSIDE CABINET<br />
CABINET<br />
SIDE PANEL<br />
SEALING STRIP<br />
(Field Provided)<br />
CABINET<br />
SIDE PANEL<br />
Page 11