BRAVO Install Manual - At Andiron Fireplace Shop
BRAVO Install Manual - At Andiron Fireplace Shop
BRAVO Install Manual - At Andiron Fireplace Shop
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4<br />
Termination Locations<br />
A. Vent Termination Minimum Clearances<br />
HORIZONTAL<br />
OVERHANG<br />
WARNING<br />
Fire Risk.<br />
Explosion Risk.<br />
Inspect external vent cap regularly.<br />
• Ensure no debris blocks cap.<br />
• Combustible materials blocking cap may<br />
ignite.<br />
• Restricted air fl ow affects burner operation.<br />
2 FT.<br />
MIN.<br />
GAS DIRECT VENT<br />
TERMINATION CAP<br />
20 INCHES MIN.<br />
LOWEST<br />
DISCHARGE<br />
OPENING<br />
X<br />
12<br />
VERTICAL<br />
WALL<br />
ROOF PITCH<br />
IS X/ 12<br />
H (MIN.) - MINIMUM HEIGHT FROM ROOF<br />
TO LOWEST DISCHARGE OPENING<br />
WARNING<br />
Fire Risk.<br />
Explosion Risk.<br />
Maintain vent clearance to combustibles as<br />
specifi ed.<br />
• Do not pack air space with insulation or other<br />
materials.<br />
Failure to keep insulation or other materials<br />
away from vent pipe may cause fi re.<br />
Measure vertical clearances from this surface.<br />
Roof Pitch<br />
H (Min.) Ft.<br />
Flat to 6/12...........................................................1.0*<br />
Over 6/12 to 7/12 .................................................1.25*<br />
Over 7/12 to 8/12 .................................................1.5*<br />
Over 8/12 to 9/12 .................................................2.0*<br />
Over 9/12 to 10/12 ...............................................2.5<br />
Over 10/12 to 11/12 .............................................3.25<br />
Over 11/12 to 12/12 .............................................4.0<br />
Over 12/12 to 14/12 .............................................5.0<br />
Over 14/12 to 16/12 .............................................6.0<br />
Over 16/12 to 18/12 .............................................7.0<br />
Over 18/12 to 20/12 .............................................7.5<br />
Over 20/12 to 21/12 .............................................8.0<br />
* 3 foot minimum in snow regions<br />
Figure 4.2 Minimum height from roof to lowest discharge<br />
opening<br />
Figure 4.2 specifi es minimum vent heights for various<br />
pitched roofs.<br />
GAS, WOOD OR FUEL<br />
OIL TERMINATION<br />
B<br />
C<br />
GAS<br />
TERMINATION<br />
Measure horizontal clearances from this surface.<br />
A<br />
Figure 4.1<br />
(See Figure 4.4 for specific clearances)<br />
Gas<br />
Termination<br />
Wood & Fuel Oil<br />
Termination<br />
Figure 4.3 Multiple Vertical Termination<br />
Comments<br />
A 6 in. 20 in. min. Horizontal distance between terminations<br />
B 20 in. 24 in. min. Distance to perpendicular wall<br />
C 18 in. 18 in. Vertical distance between terminations<br />
10<br />
Heat & Glo • Bravo • 704-902 Rev. D • 5/08