Architectural Salvage Assessment, Contributing ... - City of Oakland
Architectural Salvage Assessment, Contributing ... - City of Oakland
Architectural Salvage Assessment, Contributing ... - City of Oakland
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 4.17. This early view, looking east, depicts one <strong>of</strong> the “800 series”<br />
warehouses (probably 802) nearing completion in October 1941. The<br />
wood siding has been painted, but windows and doors are not yet<br />
installed. Framing and sheathing is in process on the warehouse to the<br />
left. (Port <strong>of</strong> <strong>Oakland</strong> Archives.)<br />
Figure 4.18. Aerial view <strong>of</strong> partially completed row <strong>of</strong> “800 series”<br />
warehouses, early 1942. The view looks east. The warehouses shown (from<br />
right to left) are Buildings 802, 803, 804, and 805, at the south end <strong>of</strong> the<br />
row. The final three warehouses (Buildings 806, 807, and 808) would be<br />
completed at the north end <strong>of</strong> the row later that year. (<strong>Oakland</strong> Army Base<br />
Archives.)<br />
50