07.11.2014 Views

Architectural Salvage Assessment, Contributing ... - City of Oakland

Architectural Salvage Assessment, Contributing ... - City of Oakland

Architectural Salvage Assessment, Contributing ... - City of Oakland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 4.17. This early view, looking east, depicts one <strong>of</strong> the “800 series”<br />

warehouses (probably 802) nearing completion in October 1941. The<br />

wood siding has been painted, but windows and doors are not yet<br />

installed. Framing and sheathing is in process on the warehouse to the<br />

left. (Port <strong>of</strong> <strong>Oakland</strong> Archives.)<br />

Figure 4.18. Aerial view <strong>of</strong> partially completed row <strong>of</strong> “800 series”<br />

warehouses, early 1942. The view looks east. The warehouses shown (from<br />

right to left) are Buildings 802, 803, 804, and 805, at the south end <strong>of</strong> the<br />

row. The final three warehouses (Buildings 806, 807, and 808) would be<br />

completed at the north end <strong>of</strong> the row later that year. (<strong>Oakland</strong> Army Base<br />

Archives.)<br />

50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!