- Page 1 and 2: Natomas Levee Improvement Program S
- Page 3 and 4: 3.4.1 Fish and Wildlife Facilities.
- Page 5 and 6: 1 Background and Purpose The purpos
- Page 7 and 8: 2.2 Levees and Floodwalls This acco
- Page 9 and 10: will be performed by USACE. The USA
- Page 11 and 12: 3 Comparison to USACE NED Plan by R
- Page 13 and 14: 3.1.5 Relocations SAFCA’s estim
- Page 15 and 16: 3.2 Reach B (Sacramento River East
- Page 17 and 18: incurred to date and projections fo
- Page 19 and 20: 3.2.9 Summary - Reach B When totale
- Page 21 and 22: 3.3 Reach C (Sacramento River East
- Page 23 and 24: efforts to comply with evolving fed
- Page 25 and 26: 3.4 Reach D (Natomas Cross Canal) R
- Page 27 and 28: 3.4.8 Construction Management SAF
- Page 29 and 30: 3.5 Reach E (Pleasant Grove Creek C
- Page 31 and 32: 3.5.8 Summary - Reach E When totale
- Page 33 and 34: SAFCA’s estimate also includes co
- Page 35 and 36: 3.7 Reach G (NEMDC from Elverta Roa
- Page 37 and 38: 3.7.9 Summary - Reach G When totale
- Page 39 and 40: 3.8.4 Lands & Damages A small amou
- Page 41 and 42: 3.9 Reach I (American River North L
- Page 43 and 44: 3.9.9 Summary - Reach I When totale
- Page 45: Table 10: Total Program comparison
- Page 49 and 50: Revised Draft NLIP Mitigation Const
- Page 51 and 52: Revised Draft NLIP Mitigation Const
- Page 53 and 54: Revised Draft NLIP Mitigation Const
- Page 62 and 63: REACH D ATTACHMENT 1 SAFCA - NLIP P
- Page 64 and 65: REACH E SAFCA - NLIP PROGRAM DWR 20
- Page 66 and 67: REACH G ATTACHMENT 1 SAFCA - NLIP P
- Page 68 and 69: ATTACHMENT 2
- Page 70 and 71: ATTACHMENT 2
- Page 72 and 73: ATTACHMENT 2
- Page 74 and 75: Technical Evaluation DISCUSSION OF
- Page 76 and 77: Technical Evaluation 2.1 Reach C 2.
- Page 78 and 79: Technical Evaluation 2.3.2 Assumpti
- Page 80 and 81: Technical Evaluation TABLE 1 Sacram
- Page 82 and 83: USACE - Sacramento District Natomas
- Page 84 and 85: USACE - Sacramento District Natomas
- Page 86 and 87: Summary of HDR Costs Total Costs Re
- Page 88 and 89: NLIP Cost Estimate 01/13/11 2.4.8 C
- Page 90 and 91: NLIP Cost Estimate 01/13/11 11.1.33
- Page 92 and 93: NLIP Cost Estimate 01/13/11 Elkhorn
- Page 94 and 95: Reach C NLIP Cost Estimate 01/13/11
- Page 96 and 97:
NLIP Cost Estimate 01/13/11 11.5.23
- Page 98 and 99:
NLIP Cost Estimate 01/13/11 2.3 SRE
- Page 100 and 101:
Reach I NLIP Cost Estimate 01/13/11
- Page 102:
Technical Evaluation APPENDIX B Sac
- Page 115 and 116:
Technical Memorandum (DRAFT) To: Jo
- Page 117 and 118:
Sacramento River. There are a total
- Page 119 and 120:
South Sutter The portion of the Sou
- Page 121 and 122:
The structure demolition and tree r
- Page 123 and 124:
Riverside Canal, approximately 230
- Page 125 and 126:
epositioning of the existing pump o
- Page 127 and 128:
Airport North Site 4 Airport North
- Page 129 and 130:
feet of levee crown will be removed
- Page 131 and 132:
4.3.4 NCMWC Elkhorn Canal The total
- Page 133 and 134:
the PGCC could be constructed with
- Page 135 and 136:
6.2 Relocations 6.2.1 RD 1000 Facil
- Page 137 and 138:
Krumenacher The Krumenacher propert
- Page 139 and 140:
pump discharge pipes, the bike trai
- Page 141 and 142:
Canal. Two concrete arch culverts w
- Page 143 and 144:
Reach G Levees and Floodwalls Borro
- Page 145 and 146:
Sacramento Area Flood Control Agenc
- Page 147 and 148:
Sacramento Area Flood Control Agenc
- Page 149 and 150:
Sacramento Area Flood Control Agenc
- Page 151 and 152:
Sacramento Area Flood Control Agenc
- Page 154:
Sacramento Area Flood Control Agenc
- Page 159 and 160:
Sacramento Area Flood Control Agenc
- Page 161 and 162:
Sacramento Area Flood Control Agenc
- Page 163 and 164:
Sacramento Area Flood Control Agenc
- Page 165 and 166:
Sacramento Area Flood Control Agenc
- Page 168 and 169:
Sacramento Area Flood Control Agenc
- Page 170 and 171:
Sacramento Area Flood Control Agenc
- Page 172 and 173:
Sacramento Area Flood Control Agenc
- Page 174 and 175:
Sacramento Area Flood Control Agenc
- Page 176 and 177:
Sacramento Area Flood Control Agenc
- Page 178 and 179:
Sacramento Area Flood Control Agenc
- Page 180 and 181:
Sacramento Area Flood Control Agenc
- Page 182 and 183:
Sacramento Area Flood Control Agenc
- Page 184 and 185:
Sacramento Area Flood Control Agenc
- Page 186 and 187:
REACH D
- Page 188 and 189:
Sacramento Area Flood Control Agenc
- Page 191 and 192:
REACH E
- Page 195 and 196:
REACH F
- Page 197 and 198:
Sacramento Area Flood Control Agenc
- Page 199 and 200:
Sacramento Area Flood Control Agenc
- Page 201 and 202:
REACH H
- Page 203 and 204:
Sacramento Area Flood Control Agenc
- Page 205 and 206:
Sacramento Area Flood Control Agenc
- Page 208 and 209:
Sacramento Area Flood Control Agenc
- Page 210 and 211:
APPENDIX E
- Page 212 and 213:
Borrow Sites The real estate area b
- Page 214 and 215:
Reach G 1. A width of 167 ft and a
- Page 216 and 217:
SAFCA - ACOE REACH A - SR 15 - 20 R
- Page 218 and 219:
SAFCA - ACOE REACH B - SAC RIVER 5B
- Page 220 and 221:
APPROXIMA TE ACQUISITIO N AREA * Le
- Page 222 and 223:
SAFCA - ACOE REACH D - NATOMAS CROS
- Page 224 and 225:
SAFCA - ACOE REACH F - NEMDC (PGCC
- Page 226 and 227:
SAFCA - ACOE REACH H (NEMDC from Pu
- Page 228 and 229:
NAME APN REACH Allegheny 225-0190-0