04.11.2012 Views

OPERATING MANUAL - Hettich AG, CH

OPERATING MANUAL - Hettich AG, CH

OPERATING MANUAL - Hettich AG, CH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Putting into Operation<br />

4.4 Filling the freshwater tanks<br />

(only for CTC 256 climatic test chambers)<br />

The CTC climatic test chamber is equipped with four tanks, each holding 10 litres; these are located<br />

in the drawer at the front right (Fig. 13). The two rear tanks (A1 and A2) are used to collect<br />

condensation water produced during operation. The two front tanks (B1 and B2) contain<br />

fresh water, which the test chamber needs to humidify the interior. The TTC temperature test<br />

chamber is equipped with just two condensation water tanks, and has no fresh water tank.<br />

To fill the fresh water tank, pull the drawer out of the test chamber (Fig. 13). Press the attachment<br />

clip on the tube connection and pull the tube connection upwards and off (Fig. 14). The<br />

lid can be removed, the tank taken out and filled with fresh water. Then, twist the lid back<br />

onto the tank and push on the tube connection until it clicks into place.<br />

Caution:<br />

Only use distilled water or DI water.<br />

22<br />

A1 A2 B1 B2<br />

Fig. 13<br />

Tank drawer (shown in figure: CTC climatic<br />

test chamber, the TTC temperature test<br />

chamber has just one condensation water<br />

tank behind a flap, and no freshwater tank)<br />

A1, A2 2 condensation water tanks, 10 l<br />

each<br />

B1, B2 2 freshwater tanks, 10 l each<br />

1<br />

Fig. 14<br />

1 Press the attachment clip on the tube<br />

connection<br />

2 Pull the tube connection upwards and<br />

off.<br />

3 Open the sealable lid<br />

2<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!