20.11.2014 Views

Hyload Design Guide - IKO

Hyload Design Guide - IKO

Hyload Design Guide - IKO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HYLOAD DPC AND CAVITY TRAY SYSTEMS 25<br />

<strong>Hyload</strong> DPC<br />

Fixing Strip and<br />

Fixing Pins for<br />

Masonry<br />

Window arch<br />

Ruberoid Arch Preformed Cloak Unit<br />

<strong>Hyload</strong> DPC<br />

Jointing Tape on<br />

Ruberoid Self-Adhesive<br />

Primer, alternatively<br />

<strong>Hyload</strong> DPC mastic<br />

can be used<br />

DPCs must project 5 mm beyond the<br />

external face and must be bedded on<br />

both faces with mortar.<br />

All joints between lengths of DPC, and<br />

DPC and Preformed Cloak Units must<br />

be lapped a minimum of 100 mm and<br />

bonded with <strong>Hyload</strong> DPC Lap Adhesive<br />

or <strong>Hyload</strong> DPC Jointing Tape.<br />

The cavity tray should step down or<br />

slope across the cavity not less than<br />

150 mm towards the external leaf.<br />

Insulation omitted for clarity.<br />

Technical hotline: 0800 587 7391 www.ruberoid.co.uk

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!