20.11.2014 Views

Hyload Design Guide - IKO

Hyload Design Guide - IKO

Hyload Design Guide - IKO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HYLOAD DPC AND CAVITY TRAY SYSTEMS 31<br />

Ruberoid Synthaprufe LAC<br />

for vapour and air resistance<br />

to inner fabric<br />

Protection to<br />

structurally clad unit<br />

Note: Cladding Systems Limited<br />

recommends the use of Synthraprufe<br />

LAC in conjunction with their cladding<br />

products.<br />

Cladding by<br />

Cladding Systems Limited<br />

or similar<br />

Wind post<br />

Steel wind post<br />

Preformed Wind Post<br />

Cloak Unit<br />

Insulation<br />

Cloak bonded with<br />

<strong>Hyload</strong> DPC Mastic<br />

DPCs must project 5 mm beyond the<br />

external face and must be bedded on<br />

both faces with mortar.<br />

All joints between lengths of DPC, and<br />

DPC and Preformed Cloak Units must<br />

be lapped a minimum of 100 mm and<br />

bonded with <strong>Hyload</strong> DPC Lap Adhesive<br />

or <strong>Hyload</strong> DPC Jointing Tape.<br />

The cavity tray should step down or<br />

slope across the cavity not less than<br />

150 mm towards the external leaf.<br />

Insulation omitted for clarity.<br />

Technical hotline: 0800 587 7391 www.ruberoid.co.uk

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!