HYLOAD DPC AND CAVITY TRAY SYSTEMS 27<br />

Column detail/stone<br />

<strong>Hyload</strong> DPC Fixing Strip<br />

and Fixing Pins for Masonry<br />

Ruberoid Preformed Cloak Unit<br />

<strong>Hyload</strong> MortarMatch<br />

DPC formed to create<br />

cavity tray<br />

A small bead of<br />

Ruberoid Ruberflex<br />

Sealant can be applied<br />

around the dowel.<br />

Extreme care<br />

should be taken<br />

to avoid any future<br />

staining<br />

Intermediate concrete<br />

floor/stone<br />

<strong>Hyload</strong> MortarMatch DPC<br />

formed to create cavity tray<br />

DPCs must project 5 mm beyond the<br />

external face and must be bedded on<br />

both faces with mortar.<br />

All joints between lengths of DPC, and<br />

DPC and Preformed Cloak Units must<br />

be lapped a minimum of 100 mm and<br />

bonded with <strong>Hyload</strong> DPC Lap Adhesive<br />

or <strong>Hyload</strong> DPC Jointing Tape.<br />

The cavity tray should step down or<br />

slope across the cavity not less than<br />

150 mm towards the external leaf.<br />

Insulation omitted for clarity.<br />

Technical hotline: 0800 587 7391 www.ruberoid.co.uk