12<br />
p) All fossils, coins, articles of value of antiques and structures and other<br />
remains or things of geological or archeological interest discovered in the<br />
site of work shall be deemed to be the absolute property of CSL and the<br />
contractor shall take responsible precautions to prevent his workmen or any<br />
other persons from removing or damaging any such article or thing and shall<br />
immediately upon discovery thereof and before removal, acquaint the<br />
Departmental Officers of such recovery and carry out at the expense of the<br />
Department, the engineer-in-charge’s orders as to the disposal of the same.<br />
q) The contractor shall provide boat (s), at his own cost, as and when required<br />
by the departmental personnel for supervision works, throughout the<br />
contract period.<br />
31. ALTERATIONS/ADDITIONS/OMISSIONS<br />
The quantity given in the schedule of quantities is only approximate and is<br />
given to provide a common base for tendering. Payment will be made for the<br />
actual quantities of work carried out to the directions of the Engineer-in-charge,<br />
measurement will be taken based on Initial/Final soundings of area dredged and<br />
valued at the rate quoted in the schedule of quantities, so long as the total cost<br />
of works done does not increase or decrease from the contract quantity by<br />
fifteen percent. Any deviations executed beyond the agreement quantity<br />
without approval of the engineer-in-charge will not be eligible for payment.<br />
32. MEASUREMENT<br />
Measurement and quantity of dredging will be arrived, based on the initial and<br />
final level/soundings, in the area dredged with 1 in 10 slopes. The quantity<br />
calculation will be carried out using Simpsons rule. Dredging done beyond the<br />
depths specified by the Engineer in charge will not be payable. Measurement<br />
will be taken using echo sounder.<br />
33. WORKMANSHIP<br />
The whole work shall be completed in a diligent manner within the contract<br />
period and defect or imperfection if any, observed shall be rectified at<br />
contractor’s cost to the full satisfaction of the engineer-in-charge.<br />
34. INSURAN<strong>CE</strong> AGAINST ACCIDENT TO WORKMEN:<br />
The contractor shall insure against such liability and shall continue such<br />
insurance during the whole of the time that any persons are employed by him<br />
on the works. Provided that, in respect of any persons employed by any subcontractor,<br />
the contractor’s obligations to insure as aforesaid under this subclause<br />
shall be satisfied if the sub-contractor shall have insured against the<br />
liability in respect of such persons in such manner that CSL is indemnified<br />
under the policy, but the contractor shall require such sub-contractor to produce<br />
before CSL, such policy of insurance and the receipt for the payment of current<br />
premium.