13<br />
35. INSURAN<strong>CE</strong> TO DREDGER:<br />
The contractor shall insure dredger and other supporting crafts/ equipments<br />
deployed for the work against normal marine risks. The dredger should also<br />
have Protection and Indemnity (P&I) or such cover, which shall include<br />
salvage of said dredger in case she is sunk within the Cochin Shipyard Limited<br />
limits and is required to be salvaged by the contractor.<br />
36. Following services will be given free of cost depending upon availability. Contractor<br />
has to make his own arrangements to avail the same at his risk and subject to<br />
satisfying statutory rules and regulations if any.<br />
a) Crane facility based on crane reach availability.<br />
37. TIME SCHEDULE AND MONITORING OF PROGRESS<br />
The tenderer shall prepare and attach with the technical bid a detailed work<br />
programme indicating key activities and critical items and showing the order in<br />
which he proposes to carry out the work for completing the same within the<br />
stipulated contract period.<br />
The contractor shall furnish to the engineer-in-charge progress reports of the<br />
work during execution indicating delay, if any, its reason and proposal to make<br />
up the delay.<br />
38. RELEASE OF SECURITY DEPOSIT<br />
10% of the value of work retained towards security deposit shall be released<br />
only after payment of the final bill after observing all formalities and after the<br />
satisfactory completion of the rectification of defects/imperfection noticed and<br />
after clearing of site.<br />
39. EMD submitted by unsuccessful tenderers will be released within 10 days of release<br />
of work order or immediately after the expiry of validity period of tender.<br />
40. The contract shall be governed by the laws in force in <strong>India</strong>. Any dispute arising will<br />
be subject to the jurisdiction of the court in COCHIN.<br />
41. FOR<strong>CE</strong> MAJEURE EVENTS<br />
In the event of circumstance or a combination of events and circumstances which are<br />
referred below and which are beyond the reasonable control of the contractor and / or<br />
employer as the case may be or which could not have been prevented by the exerciser<br />
of reasonable skill and care, and which or the consequences of which materially affect<br />
the execution of the work, or the contractor’s obligations under this Contract in whole<br />
or in part then and in that event the contractor shall be, subject to the provisions of<br />
this contract, entitled to claim proportionate extension of the contract period.<br />
(i) Force majeure including but not limited to:<br />
(a) War, hostilities (whether war be declared or not), invasion, act of foreign<br />
enemies,<br />
(b) Rebellion, terrorism, revolution, insurrection, military or usurped power,<br />
or civil war,