23.11.2014 Views

2012-2016 Microsystem Technology Strategy and Roadmaps

2012-2016 Microsystem Technology Strategy and Roadmaps

2012-2016 Microsystem Technology Strategy and Roadmaps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TRL 9: Successful Shipment <strong>and</strong>/or Operations: System proven<br />

through successful operations; actual application of the technology is<br />

in its final form<br />

TRL 8: Test <strong>and</strong> Demonstration: System completed <strong>and</strong> qualified<br />

through test <strong>and</strong> demonstration; technology has been proven to work<br />

in its final form<br />

TRL 7: Operational Prototype Demonstration: System prototype<br />

demonstration in a operational environment; prototype at or near<br />

operational system<br />

TRL 6: Prototype Demonstration: System/subsystem model or<br />

prototype demonstration in a relevant environment; representative<br />

model or prototype system is tested in a relevant environment, e.g. …<br />

TRL 5: Simulated Environment Testing: componenet <strong>and</strong>/or<br />

breadboard validation in relevant environment; technological<br />

components are integrated with reasonable realistic supporting …<br />

TRL 4: Trade-offs <strong>and</strong> Interfacing: Component <strong>and</strong>/or breadboard<br />

validation in lab environment; basic technological components are<br />

integrated to establish that the pieces work well together<br />

TRL3: Partitioning <strong>and</strong> Characterization: Analytical <strong>and</strong> experimental<br />

laboratory studies are a critical function; active research <strong>and</strong><br />

development initiated<br />

TRL2: Conceptualization: <strong>Technology</strong> concept ans/pr application<br />

formulated; invention begins<br />

<strong>Technology</strong> Readiness Level – Client Activity<br />

652 Faculty Members Reporting in 2010<br />

TRL1: Establishing Basic Principles: Basic Principles observed <strong>and</strong><br />

reported; scientific research begins<br />

0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20%<br />

Distribution of Faculty Member TRL Activities<br />

© <strong>2012</strong>, CMC <strong>Microsystem</strong>s <strong>Strategy</strong> <strong>and</strong> Roadmap, Work in Progress 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!