24.11.2014 Views

rapid assessment of drinking-water quality in the republic of tajikistan

rapid assessment of drinking-water quality in the republic of tajikistan

rapid assessment of drinking-water quality in the republic of tajikistan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 7. Total number <strong>of</strong> analyses completed <strong>in</strong> Khatlon by 15 February 2005<br />

No.<br />

Implemented<br />

Remarks<br />

Cluster Districts Type a No. <strong>of</strong><br />

samples<br />

No. <strong>of</strong><br />

rounds<br />

Total no. <strong>of</strong><br />

analyses<br />

1 1 Bokhtar UPS 20 2 40<br />

2 2<br />

Dangara<br />

Farhor UPS 20 1 20<br />

3 3<br />

Gozimalik<br />

Khoja Maston<br />

Yavan UPS 25 1 25<br />

4 4<br />

Khoval<strong>in</strong>g<br />

Mum<strong>in</strong>abad<br />

Shurabad UPS 20 1 20<br />

5 5 Kulyab UPS 25 1 25<br />

6 6 Moskovskiy UPS 20 1 20<br />

7 7 Moskovskiy UPS 20 1 20<br />

8 8<br />

Sarband<br />

Vakhsh UPS 25 2 50<br />

9 9 Vosse UPS 13 1 13<br />

10 10 Baljuvan PS 15 1 15<br />

11 11 Baljuvan PS 15 1 15<br />

12 12 Khoval<strong>in</strong>g PS 15 1 15<br />

13 13 Khoval<strong>in</strong>g PS 20 1 20<br />

14<br />

Moskovskiy<br />

Shurabad PS 15 1 15<br />

15 Mum<strong>in</strong>abad PS 15 1 15<br />

16 Sovetskiy PS 18 1 18<br />

Total no. analyses completed: 346<br />

a<br />

PS = protected spr<strong>in</strong>g. UPS = utility piped supply.<br />

The follow<strong>in</strong>g analyses are planned by <strong>the</strong> end <strong>of</strong> <strong>the</strong> month:<br />

Cluster 3: Gozimalik. Khoja-Maston, Yavan (25 UPS) 2nd round.<br />

The planned and completed analyses for 15 February 2005, as well as <strong>the</strong> percentage <strong>of</strong> completed<br />

analyses, are shown <strong>in</strong> Table 8 for each broad area.<br />

Table 8.<br />

Total number <strong>of</strong> planned and completed analyses<br />

No. Broad area Total no. <strong>of</strong><br />

analyses<br />

Actual no. <strong>of</strong> analyses<br />

completed by 31<br />

January 2005<br />

Completed<br />

analyses<br />

(% <strong>of</strong> total)<br />

1 GBAO a 102 102 100.0<br />

2 RRS & Dushanbe 674 539 80.0<br />

3 Sughd 515 290 56.3<br />

4 Khatlon 489 346 70.8<br />

Total: 1 780 1 277 71.7<br />

a<br />

GBAO = Gordo-Badakhshan Autonomous Oblast. RRS = rayons under direct <strong>republic</strong>an subord<strong>in</strong>ation.<br />

64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!