26.11.2014 Views

Title of the Project is to be Written here in Bold Times New Roman ...

Title of the Project is to be Written here in Bold Times New Roman ...

Title of the Project is to be Written here in Bold Times New Roman ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

JWF Fund 2010 Report #500<br />

chart must <strong>be</strong> filled <strong>in</strong> US$<br />

Item Content Unit cost(US$) Quantity Amount(US$)<br />

Sett<strong>in</strong>g out<br />

Provid<strong>in</strong>g pegs,<br />

pr<strong>of</strong>iles, template<br />

<strong>in</strong>struments and<br />

check same with <strong>the</strong><br />

Architect.<br />

Provid<strong>in</strong>g water and<br />

transport all<br />

materials<br />

Stage two<br />

Substructure(excav<br />

ation and Earth<br />

work), Digg<strong>in</strong>g <strong>of</strong><br />

<strong>the</strong> pit <strong>to</strong>ilets<br />

Block lay<strong>in</strong>g/works<br />

Land <strong>is</strong> measured 15m<br />

x 15m<br />

pegs<br />

- - -<br />

0.3 20 6<br />

ropes 0.5 10 5<br />

Water for <strong>the</strong> work<br />

Transportation <strong>of</strong> all <strong>the</strong><br />

materials with Hired<br />

vehicle<br />

Digg<strong>in</strong>g 3 pit holes <strong>of</strong><br />

0.01 5000 ltrs 50<br />

- - 40<br />

2<br />

30 ft<br />

deep x 3<br />

270<br />

Blocks (6 <strong>in</strong>ches)<br />

1 80 80<br />

3 bags <strong>of</strong> cement for<br />

each slab 11 9 99<br />

Slab bars for<br />

cover<strong>in</strong>g/dress<strong>in</strong>g <strong>of</strong><br />

each <strong>of</strong> <strong>the</strong> three<br />

pit holes<br />

sand<br />

concrete<br />

12mm rods<br />

4 3 cubits 12<br />

10 3 cubits 30<br />

13 6 78<br />

Plaster<strong>in</strong>g/ floor<strong>in</strong>g<br />

Ro<strong>of</strong><strong>in</strong>g<br />

Fix<strong>in</strong>g <strong>of</strong> doors and<br />

hollow blocks for<br />

ventilation<br />

Pa<strong>in</strong>t<strong>in</strong>g<br />

<strong>Project</strong><br />

d<strong>is</strong>sem<strong>in</strong>ation<br />

workshop/comm<strong>is</strong>si<br />

on<strong>in</strong>g ceremony<br />

Labour contribution<br />

sand<br />

cement<br />

4 8 32<br />

11 3 33<br />

Nails (3” and 4”)<br />

1<br />

40 pieces<br />

each<br />

2<br />

z<strong>in</strong>c 4 20 pieces 80<br />

Iron doors 25 3 75<br />

hollow blocks <strong>in</strong> place<br />

<strong>of</strong> w<strong>in</strong>dows. 3 <strong>in</strong> each<br />

1 9 9<br />

<strong>to</strong>ilet<br />

25 – liter emulsion<br />

35 3 105<br />

Writ<strong>in</strong>g materials for<br />

50<br />

participants and<br />

1.5 persons<br />

d<strong>is</strong>tribution <strong>of</strong> summary<br />

present<br />

<strong>of</strong> project report<br />

75<br />

For pr<strong>of</strong>essional<br />

consults<br />

33 1 pers 33<br />

Total Amount 1,114<br />

PTA Contribution for<br />

labour<br />

Total used for <strong>the</strong><br />

work<br />

Persons <strong>to</strong> ass<strong>is</strong>t <strong>to</strong><br />

facilitate <strong>the</strong> work and<br />

ensure quality<br />

5.1<br />

6<br />

persons<br />

153<br />

-<br />

961

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!