25.12.2014 Views

Installation Manual C15, C20, C25 - Waltco

Installation Manual C15, C20, C25 - Waltco

Installation Manual C15, C20, C25 - Waltco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BATTERY KIT INSTALLATIONS 80101387<br />

DETERMINE BATTERY AND PUMP LOCATION, AND<br />

CABLE ROUTING<br />

Determine where pump unit and battery box will be<br />

located. Make certain hydraulic hoses supplied will<br />

reach pump.<br />

Your installation may use only one cable supplied with<br />

liftgate, or, it may also use a cable supplied with the<br />

trailer kit.<br />

Truck with auxiliary batteries:<br />

Cable supplied with liftgate will be cut into two lengths to<br />

reach from pump to auxiliary batteries and to vehicle<br />

batteries.<br />

PUMP<br />

AUXILIARY<br />

BATTERY<br />

VEHICLE<br />

BATTERY<br />

Trailer with auxiliary batteries:<br />

Use cable supplied with liftgate from pump to auxiliary<br />

batteries.<br />

Use cable supplied with trailer kit from auxiliary batteries<br />

to nose of trailer.<br />

Note: Auxiliary batteries on trailers are to be<br />

-<br />

GR01389<br />

Page 34<br />

EO6410 Rev 04<br />

7-22-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!