Installation Manual C15, C20, C25 - Waltco
Installation Manual C15, C20, C25 - Waltco
Installation Manual C15, C20, C25 - Waltco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
BATTERY KIT INSTALLATIONS 80101387<br />
DETERMINE BATTERY AND PUMP LOCATION, AND<br />
CABLE ROUTING<br />
Determine where pump unit and battery box will be<br />
located. Make certain hydraulic hoses supplied will<br />
reach pump.<br />
Your installation may use only one cable supplied with<br />
liftgate, or, it may also use a cable supplied with the<br />
trailer kit.<br />
Truck with auxiliary batteries:<br />
Cable supplied with liftgate will be cut into two lengths to<br />
reach from pump to auxiliary batteries and to vehicle<br />
batteries.<br />
PUMP<br />
AUXILIARY<br />
BATTERY<br />
VEHICLE<br />
BATTERY<br />
Trailer with auxiliary batteries:<br />
Use cable supplied with liftgate from pump to auxiliary<br />
batteries.<br />
Use cable supplied with trailer kit from auxiliary batteries<br />
to nose of trailer.<br />
Note: Auxiliary batteries on trailers are to be<br />
-<br />
GR01389<br />
Page 34<br />
EO6410 Rev 04<br />
7-22-10