9-01-06<br />
improvements. A Cash Escrow may be considered for acceptance of said<br />
security; no other forms of security shall be accepted. The exact terms of<br />
this alternative shall be satisfactory to the Attorney for the <strong>County</strong> Mayor<br />
and Planning Commission. A three-party agreement must be presented<br />
with the security (Cash Escrow), between the developer, guarantor, and<br />
the <strong>County</strong>. In addition, these alternatives shall be written so that they are<br />
collectable by the <strong>County</strong> upon presentation with a letter from the Director<br />
of Engineering of the <strong>Blount</strong> <strong>County</strong> Highway Department verifying that<br />
the proposed improvements are not completed as scheduled for a<br />
performance security. The same shall apply for a Maintenance Security for<br />
the improvements if said improvements fail to withstand the first year of<br />
use without damage.<br />
Any off-site improvements, including but not limited to road width<br />
improvements along existing county roads, acquisition of right-of-ways,<br />
easements and other properties are the responsibility of the developer to<br />
negotiate with the Highway Department. A condition precedent to develop<br />
a major subdivision is that the existing county roadway must have a paved<br />
surface a minimum of 18 feet wide with two foot shoulders on both sides.<br />
When a major subdivision is proposed along a county roadway that is less<br />
than 18 feet wide of existing paved surface with two foot wide shoulders<br />
on both sides, the developer must make the necessary improvements to<br />
bring the existing roadway up to the minimum of 18 feet wide of pavement<br />
with two foot wide shoulders on both sides including necessary ditching<br />
and right-of-way acquisition to the next county roadway that meets the<br />
minimum road width requirement. Any agreements between the developer<br />
and the Highway department must be in writing and supplied to the<br />
Planning Staff along with preliminary plat requirements. All off-site<br />
improvements must be agreed to in writing prior to any on-site<br />
construction. All off-site improvements must be complete prior to any final<br />
plats are signed by the secretary of the planning commission, including<br />
any [phased developments as well as existing road frontage lots.<br />
3.06 Road Maintenance and Drainage Assurance After Final Plat:<br />
A maintenance security (letter-of credit) for the maintenance and repair of<br />
any new public road and all drainage facilities located within the dedicated<br />
right-of-way (as shown on the final plat) is required. This maintenance<br />
security is separate from the construction security for required<br />
improvements. The maintenance security shall be a three-party<br />
agreement executed by the developer (and guarantor) to the county for a<br />
period of one-year from the date the final plat is recorded. The amount of<br />
the maintenance security will be determined by the county engineer based<br />
on the particulars of the road and drainage facilities.<br />