North Coast Line South Information Pack - Queensland Rail
North Coast Line South Information Pack - Queensland Rail
North Coast Line South Information Pack - Queensland Rail
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Incidents<br />
Train consists (Train Builder)<br />
Speed restrictions<br />
Rollingstock allocations<br />
Rollingstock maintenance<br />
Fresh turnouts<br />
Planning graphs<br />
Scheduling enhancements<br />
Possession enhancements<br />
OTIS (Operational to <strong>Information</strong> Systems) - which converts train steps to<br />
actual arrival and departure train information.<br />
OPERATIONAL SYSTEMS & TRAIN CONTROL<br />
The <strong>North</strong> <strong>Coast</strong> <strong>Line</strong> System is operated by Remote Control Signalling (RCS), Automatic<br />
Train Control (ATC) and Automatic Train Protection (ATP).<br />
Train Control for the <strong>North</strong> <strong>Coast</strong> <strong>Line</strong>, from Nambour to Parana is located in Brisbane<br />
whilst Train Control for Parana to Rockhampton is located in Rockhampton<br />
OPERATIONAL CONSTRAINTS - ROLLINGSTOCK<br />
All new rollingstock requires to be accepted via the Rollingstock Authorisation Process,<br />
rollingstock which conforms with Drawing Nos. 2236, 2237 and 2238 may operate in<br />
an unrestricted manner on main lines.<br />
NORTH COAST LINE SYSTEM - SOUTH - INFORMATION PACK<br />
(Nambour - Gladstone and Rocklands to Rockhampton)<br />
ISSUE 2 - JUNE 2007 - 17