29.12.2014 Views

North Coast Line South Information Pack - Queensland Rail

North Coast Line South Information Pack - Queensland Rail

North Coast Line South Information Pack - Queensland Rail

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Incidents<br />

Train consists (Train Builder)<br />

Speed restrictions<br />

Rollingstock allocations<br />

Rollingstock maintenance<br />

Fresh turnouts<br />

Planning graphs<br />

Scheduling enhancements<br />

Possession enhancements<br />

OTIS (Operational to <strong>Information</strong> Systems) - which converts train steps to<br />

actual arrival and departure train information.<br />

OPERATIONAL SYSTEMS & TRAIN CONTROL<br />

The <strong>North</strong> <strong>Coast</strong> <strong>Line</strong> System is operated by Remote Control Signalling (RCS), Automatic<br />

Train Control (ATC) and Automatic Train Protection (ATP).<br />

Train Control for the <strong>North</strong> <strong>Coast</strong> <strong>Line</strong>, from Nambour to Parana is located in Brisbane<br />

whilst Train Control for Parana to Rockhampton is located in Rockhampton<br />

OPERATIONAL CONSTRAINTS - ROLLINGSTOCK<br />

All new rollingstock requires to be accepted via the Rollingstock Authorisation Process,<br />

rollingstock which conforms with Drawing Nos. 2236, 2237 and 2238 may operate in<br />

an unrestricted manner on main lines.<br />

NORTH COAST LINE SYSTEM - SOUTH - INFORMATION PACK<br />

(Nambour - Gladstone and Rocklands to Rockhampton)<br />

ISSUE 2 - JUNE 2007 - 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!