AUSTRALIA’S IDENTIFIED MINERAL RESOURCES <strong>2004</strong><br />
Goonyella coal mine owned by BHP Billition Mitsubishi Alliance (BMA), Bowen Basin, Queensland.<br />
(<strong>Geoscience</strong> <strong>Australia</strong>, Bill McKay)<br />
INDUSTRY DEVELOPMENTS – QUEENSLAND<br />
Pacific Coal: The $460 million Hail Creek open-cut mine was opened in late 2003. When fully<br />
operational the mine is planned to produce 5.5 Mtpa of hard coking coal for export. Pacific Coal is<br />
scheduled to commence longwall mining in the Ti Tree area at the Kestrel mine in January <strong>2004</strong>.<br />
At the Meandu open-cut mine production capacity has been increased from 5 to 7 Mtpa to supply<br />
coal to the Tarong and the newly commissioned Tarong North power stations.<br />
BHPBilliton Mitsubishi Alliance (BMA): In late 2003 construction commenced on a new punch<br />
longwall underground mine at Goonyella. The US$67 million Broadmeadow mine (refer<br />
Commodity Review cover page) will produce up to 3.6 Mtpa of coking coal commencing in late<br />
2005. BMA is proposing to develop another punch longwall mine at the Saraji open-cut coking<br />
coal mine. At the Blackwater mine BMA is planning to build a new 14 Mtpa coal handling and<br />
processing facility.<br />
Xstrata Coal: At Newlands, construction commenced on the Northern underground punch longwall<br />
mine as a replacement for the Southern underground mine. Production is scheduled to commence in<br />
late 2005 and is expected to produce up to 8 Mtpa. The Southern open-cut was completed in early<br />
2003 and was replaced by the recommencement of the Eastern Creek open-cut later in the year.<br />
Development of the Rolleston open-cut thermal coal mine is planned for <strong>2004</strong> and a production of<br />
6 Mtpa is expected by 2007. Xstrata is proposing to develop the Suttor Creek deposit at Newlands to<br />
replace the Main deposit which will cease in mid-<strong>2004</strong>.<br />
21<br />
Anglo Coal: During 2003, construction continued at the Grasstree Colliery. The new underground<br />
longwall coking coal mine is scheduled to commence in 2005 to replace the depleted <strong>resources</strong> at<br />
the Southern Colliery. The Oak Park open-cut mine being developed by Anglo will replace<br />
production from the German Creek East mine. At Moura the operations are being extended<br />
southward into the northern part of the Theodore deposit. Anglo plan to produce 6.2 Mtpa of<br />