Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
32<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
and they’re there much of the day, if not all day.<br />
The newer bridges will be shallower<br />
structures. By that I mean they won’t be as deep, and<br />
they will be high. So, we won’t have any severe<br />
impacts. We will have an increased area of moderate<br />
impacts, four to five hours a day of areas that may be<br />
shaded.<br />
We’ll talk about the screening process.<br />
This is kind of a matrix that we’ve developed to help<br />
us. The categories, the rows, indicate all the<br />
criteria that we’re looking at. The columns along the<br />
top are the alternatives, both for the river crossing,<br />
or the bridge types, and alignments for the highways.<br />
And we’re busy filling that in with all our<br />
information to come up with our preferred alternative.<br />
I-<strong>95</strong>, again, there are two feasible<br />
alternatives for widening the highway to provide that<br />
four lanes in each direction from the current three.<br />
Do we widen to the inside, to the median -- as I said,<br />
that’s where we’re sort of coming down -- or we’ve<br />
also looked very closely at widening to the outside.<br />
We can do different things. We can do one to the<br />
inside -- we can do northbound inside, southbound<br />
outside, or vice versa. I mean there’s all kinds of<br />