Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
36<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
bridge across. This is a representation of some<br />
activities. For the sake of the model, we did the<br />
simplest structure at this point in time, which is<br />
basically a girder bridge, showing basically some<br />
barges that would be in the water dealing with this<br />
type of work. Over here is the pier under<br />
construction on the northbound side.<br />
Then the completed highway for<br />
northbound. As you’ll see, we put northbound and<br />
southbound traffic on it. And, basically the existing<br />
configuration as it is today, which is the three lanes<br />
in each direction, the two very tight shoulder areas,<br />
which currently are two-foot. We have the two slight<br />
shoulder areas. And this is how the traffic will run<br />
until we are able to demolish the other bridge and<br />
then build the new southbound.<br />
So, you can see in this phase with the<br />
bridge open we can now demolish the existing<br />
structure. That portion in the middle will almost<br />
have to be disassembled in reverse manner of how it<br />
was built. The deck, which is below it, which is<br />
basically a swinging deck held by cables, that will be<br />
removed first. Then the arch will be disassembled<br />
from the centers out to the spans. And then each of<br />