Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
48<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
A couple of items I just wanted to<br />
mention. We’ve received a number of letters with good<br />
understanding that -- or great concern that there may<br />
be a number of right of way takings, temporary<br />
easements, acquisitions required as part of this<br />
project. Parsons Brinckerhoff will be developing the<br />
preliminary design as you see before us here.<br />
Although we’ve not identified any areas<br />
of permanent acquisitions, there may be some areas of<br />
temporary easements that will be required for the<br />
duration of construction. MassDOT will be the<br />
responsible party for acquiring those rights in<br />
lands, private or public. And, Mr. Sheehan, Michael<br />
Sheehan, will be describing for us how MassDOT goes<br />
about those efforts in acquiring the rights.<br />
MICHAEL SHEEHAN: Good evening. My<br />
name is Michael Sheehan and I represent the Right of<br />
Way Bureau of the Massachusetts Department of<br />
Transportation - Highway Division.<br />
The Right of Way Bureau is responsible<br />
for acquiring all of the necessary rights in private<br />
and public lands for the design, construction, and<br />
implementation of this project.<br />