07.01.2015 Views

Public Information Transcripts - Whittier Bridge/I-95 Improvement ...

Public Information Transcripts - Whittier Bridge/I-95 Improvement ...

Public Information Transcripts - Whittier Bridge/I-95 Improvement ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

34<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

And for the bridge crossing, the east<br />

alignment, we’ll show you some phasing diagrams of how<br />

that happens in a minute here. But, essentially,<br />

phase one, the construction of a new northbound -- the<br />

final -- the new northbound roadway, which will be<br />

constructed wide enough to handle all six lanes of<br />

traffic; move all the traffic onto the new bridge;<br />

take down the old bridge; and then build a new<br />

southbound bridge, which will be four lanes<br />

southbound.<br />

And, with that, I’ll turn it back to<br />

Mike Bertoulin. He can show you some representations<br />

of the phasing of that bridge.<br />

MICHAEL BERTOULIN: Thank you, Joe.<br />

I’m going to slowly go through the<br />

drawings we had scrolling. There basically were five<br />

of each view from the -- the first one basically from<br />

Newburyport looking across into Amesbury, from the<br />

northwest direction; and then there’s five views<br />

basically in Salisbury looking south/southwest over<br />

into Newburyport.<br />

So, this is the existing structure.<br />

This basically is the Newburyport Water Department<br />

land, Moseley Woods is roughly right about here.<br />