Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Public Information Transcripts - Whittier Bridge/I-95 Improvement ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
34<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
And for the bridge crossing, the east<br />
alignment, we’ll show you some phasing diagrams of how<br />
that happens in a minute here. But, essentially,<br />
phase one, the construction of a new northbound -- the<br />
final -- the new northbound roadway, which will be<br />
constructed wide enough to handle all six lanes of<br />
traffic; move all the traffic onto the new bridge;<br />
take down the old bridge; and then build a new<br />
southbound bridge, which will be four lanes<br />
southbound.<br />
And, with that, I’ll turn it back to<br />
Mike Bertoulin. He can show you some representations<br />
of the phasing of that bridge.<br />
MICHAEL BERTOULIN: Thank you, Joe.<br />
I’m going to slowly go through the<br />
drawings we had scrolling. There basically were five<br />
of each view from the -- the first one basically from<br />
Newburyport looking across into Amesbury, from the<br />
northwest direction; and then there’s five views<br />
basically in Salisbury looking south/southwest over<br />
into Newburyport.<br />
So, this is the existing structure.<br />
This basically is the Newburyport Water Department<br />
land, Moseley Woods is roughly right about here.<br />
Arlington Reporting Company<br />